Information
-
Site
-
Simpro Job Number
-
AGL Project manager -
-
Principle Contractor site Manager
-
Pre Validation carried out on
-
Pre Validation Conducted by -
Site Survey
-
Is this a programmable lighting system
-
Make and Model of system
-
Estimated Age of system
-
Condition of Lighting System
-
Please take a Photo of an LCM and control panel, Preferably with part numbers visible.
-
undefined
-
Is this system supplied via LCM's
-
Make and Model of system
-
Estimated Age of system
-
Condition of Lighting System
-
Please take a Photo of an LCM, Preferably with part numbers visible.
-
If possible ascertain route to roof for potential air conditioning supply? Please use this box to describe details
-
Supporting photos
-
Are PIR's present on site
-
PIR Make and Model with part numbers if possible
-
Photos of PIR's with part numbers
-
Does this site have a raised floor
-
Floor void depth
-
What type of flooring is present.
-
Does this site have a suspended ceiling
-
Measurements of Celing void
-
What type of ceiling is present.
-
Please explain any difficulties you can foresee when installing through ceiling void bulkheads.
-
Please explain any discrepancies from the drawings you can see. Mark up the drawing with the changes as this could effect quote value.
Riser Inspection
-
Check circuit schedule is present and correct.<br>
-
Check that all blanking plates are present and proper.<br>
-
Check that enclosures meet IP standards as necessary.<br>
-
Check if a Voltage Warning label is required. Can unskilled persons access the enclosure?<br>
-
Check if the DB requires a dual supply label, is it fed from more than one sourse i.e. UPS.<br>
-
Check to see if a Mixed colour label is present and/or required.<br>
-
Check to see if a RCD Test label is present and/or required.<br>
-
Check that the main switch to the DB is local. i.e. attached to the board or in the same room/ compartment <br>
-
Estimate age of Distribution equipment
-
Check that the isolator is labelled if not physically attached to enclosure.<br>
-
Check that all screws are present and proper.<br>
-
Check that whole circuits pass through the same opening . (Metallic enclosures only) <br>
-
Check that three phase breakers are used for three phase circuits. <br>
-
Check busbar barriers are present, proper and secure.<br>
-
Check neutral barriers are required, present, proper and secure. <br>
-
Check all unterminated redundant circuits are labeled and/or connected to earth. <br>
-
Check all live connections are properly enclosed and terminated.<br>
-
Check for overrated circuit breakers.<br>
-
Check that main switch is of a suitable current rating.<br>
-
Check for evidence of corrosion to enclosures, conductors, containment and busbars.<br>
-
Check that all neutrals correlate with final circuits.<br>
-
Check cable management is adequate and cables can be easily traced.<br>
-
Check tightness of connections. (Use torque driver)<br>
-
Check for evidence of overheating to cabling and equipment. <br>
-
Check to see if there are any bunched conductors/circuits.<br>
-
Check all glands are adequate to including the presence of banjos. (armoured cabling)<br>
-
Check for any redundant equipment. (Is it safely isolated)<br>
-
Check main tails and earth are adequatly sized. (If you can locate upstream protection) <br>
-
Check that DB does not contain asbestos.<br>
-
Check the Zs of the DB is adequate.<br>
-
Check the IR of the circuits we are to work on are satisfactory.<br>
-
Check that the KA of the breakers are adequate for continued use.<br>
-
Check that ring continuity for relevant circuits are satisfactory.<br>
-
Check that RCD's are present where necessary .
-
Check any RCD's function correctly.<br>
-
Check that the wiring system is adequate for the enviroment.<br>
-
Check all direct containment to the DB is secured, complete and correctly connected.<br>
-
Check if the LUX levels around switchgear is adequate, espicially if no natural light.<br>
-
Check to ensure no cores have been cut back on large multistrand conductors.<br>
-
Check to make sure all circuit breaker characteristics are present and visible, not worn.<br>
-
Check to ensure the area is free from clutter and combustable materials.<br>
-
Check cabling entering equipment has the correct bending radii. (no sharp bends)<br>
-
Surge Protection present?
-
Which type of Surge protection is in use?
Site Visual Inspection
-
Check all floor boxes for damage<br>
-
Quantity of damaged floor boxes
-
Product Details
-
Notes
-
Pictures if required
-
Check all Socket outlets for damage<br><br>
-
Quantity of damaged Sockets
-
Product Details
-
Notes
-
Pictures if required
-
Check all Isolators/ FCU's for damage<br><br>
-
Quantity of damaged Isolators / FCU's
-
Product Details
-
Notes
-
Pictures if required
-
Check all Light fittings for damage<br><br><br>
-
Quantity of damaged Light fittings
-
Product Details
-
Notes
-
Pictures if required
-
Check all Light switches for damage<br><br><br>
-
Quantity of damaged light switches
-
Product Details
-
Notes
-
Pictures if required
-
Switch on all lights, Any Non-functioning Lamps? Quantity?<br><br><br><br><br><br>
-
Quantity of damaged lamps
-
Product Details
-
Notes
-
Pictures if required
-
Check all LCM's for damage/ signs of overheating<br><br><br><br>
-
Quantity of damaged LCM's
-
Product Details
-
Notes
-
Pictures if required
-
Check Cabling for signs of damage/ overheating <br><br><br><br><br><br>
-
Quantity of damaged cabling
-
Product Details
-
Notes
-
Pictures if required
-
Check for Bonding to Water, Structural Steel etc. if applies <br><br><br><br><br>
-
Quantity
-
Product Details
-
Notes
-
Pictures if required
-
Check for Bonding to Comms cabinet. if applies <br><br><br><br><br>
-
Quantity of damaged Comms Cabinets
-
Product Details
-
Notes
-
Pictures if required
-
Sample check metal back boxes for fly leads<br><br>
-
Quantity of damaged Fly Leads
-
Product Details
-
Notes
-
Pictures if required
-
Check the supply characteristics to each floor <br>
-
Quantity
-
Product Details
-
Notes
-
Pictures if required
Additional Information
- Add Picture
-
Any picture that may be required