Title Page
-
Audit Title: Kingspan Energy Compliance
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Contractor / Foreman
Arrangements
-
Correct site image achieved
-
Welfare arrangements in place and suitable - sanitary, washing, etc
-
Weather risks managed
-
COSHH in place and up to date?
-
RAMS in place
-
RAMS approved by PC
-
Site Induction taken place and record?
-
Construction Phase Plan in place and proportionate to the works/project?
-
Has Toolbox talks taken place? evidence required.
-
Add media
PPE
-
Head protection and chin straps in use
-
Appropriate gloves
-
Boots
-
Eye protection
-
High visibility
-
Fall arrest
-
Harness checked and in date? 6 months visually and 12 months external check
-
Other PPE required specific to the Task?
-
Add media
Work Organisation
-
Employee competency evidence available
-
Pre Task briefing takes place every day
-
Building occupier risks being managed
-
Emergency response plan (fire and rescue) in place and displayed
-
First aid kit in place and sufficient
-
Fire extinguisher in place
-
Employees aware of procedures
-
Mechanical Lifting Aids used where possible?
-
LOLER Certs in place and correct
-
Scaffold handover certificate available
-
Add media
TOP RISK---Working at height
-
Working at heights controlled
-
All roof edges protected with suitable and sufficient scaffolding
-
Access safe and suitable
-
Scaf Tag in place and details correct
-
Sky light risk being controlled
-
Add media
TOP RISK....Public and third party safety
-
Works segregated and controlled
-
Construction work / traffic / public safety signage in place
-
Pedestrian controls in place
-
Access under work areas prohibited
-
Working at height signage in place
-
Access scaffold secured after hours
-
After hours security fencing in place
-
Add media
TOP RISK....Electricity
-
Safety rules in place and are being followed
-
Competent person in control of work
-
Inspection of PAT testing for all tools on-site - 110V tools and leads ?
-
Method statement includes connection and testing plan
-
Roles and responsibilities included within the method statement
-
Add media
Other
-
Material lay down segregated and controlled
-
Plant operated safely with keys removed when not in use
-
Evidence of Mobile plant checks completed?
-
Good housekeeping maintained
-
Notes-
-
Add media
-
Auditor 1 Signature
-
Auditor 2 Signature
-
Supervisor Signature