Title Page

  • Conducted on

  • Prepared by

  • Location

Ingredient Mixing Sheet

  • What Product are you Auditing?

  • Verify Correct Recipe and PI is being used

  • Observe Operator using the Ingredient Mixing Sheet to carry out Raw Material Check

Raw Material Check

  • Using the Ingredient Mixing Sheet verify the Operator has conducted a correctness check on the Raw Materials

  • Observe if the Operator has used the table scales check raw material weights and verify materials match the mixing sheet

Inspection of Bowl for Cleanliness

  • Observe Mix Operator has inspected the High Speed Bowl for cleanliness

Equipment Check

  • Check the Mix Operator has clean Utensils available

  • Check to see clean buckets are available

  • Check to see Waste Control Equipment is available (Cardboard Skip & Packaging Waste Bin)

Filling in the P.I Screen and Ingredient Mix Record Sheet

  • Verify the a correct shift hand over has taken place (P.I Screen is up to date)

  • Verify the first Dough has been reviewed by Supervisor

Procedure for Recording Information onto P.I and "Ingredient Mixing Record Sheet"

  • 1- Has the Operator acknowledged each input with a "CROSS" on the P.I and Mixing Sheet

  • 2- Verify CO2 addition in time

  • 3- Ensure the Mixing Operator has recorded strat / end times

  • 4- Verify Dough Temperature is within limits

  • 5- Observe the sieving of small ingredients

  • Inspect Re-Work practices - are there SAP codes, Dates and weight details been added.

Liquid Ingredient Addition

  • Confirm White Buckets are clean and ready for use

  • Confirm weighing practices for liquid ingredients (accuracy)

  • Observe Ingredients that require dissolving technique - are whisks being used and are the ingredients dissolved prior to addition

Verification of Correct Ingredient Usage

  • Confirm the Mixing Operator has accounted for all plastic bags against the "Ingredient Mixing Record" at the end of the mix

Using the High Speed Mixer

  • Confirm the High Speed Mixer is set the to correct settings (using the "Ingredient Mixing Record"

  • Does the Mixing Operator scrape down the mixing bowl at the completion of the first stage of mixing

  • Confirm the Operator has checked temperature and consistency at the conclusion of the mixing process

  • Confirm the Line Leader has inspected the first dough

Standing the Dough

  • Confirm the Dough has been safely tipped into the Dough Tub and is moved to a dough standing area

  • Confirm the Mixing Operator has stretched a dough cover over the tub

  • Verify that batch details matching the "Ingredient Mixing Sheet" have been applied to the dough tub.

  • Verify the batch details on the Dough Tub include - tip time - dough temperature and the Mixing Operators Sign off

  • Auditor Sign at Completion of Audit

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.