Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Job Trailer/Gang Box
-
First aid kit properly stocked?
-
Emergency phone numbers posted?
-
Fire extinguisher in trailer/fire extinguisher notification posted?
-
Laser & Powder Actuated Tool Warning Placards posted?
House Keeping
-
Trash cans & dumpsters near by empty?
-
Work areas & hallway clean & free of debris?
-
Materials from other trades out of our way?
-
Scraps picked up or stacked out of the way?
-
Toilets clean?
Fire Prevention & Protection
-
Fire extinguisher on site & close to hot work?
-
Fully charged?
-
Inspection date?
-
Flammable storage properly isolated?
-
ANSI approved cans? Clearly marked?
-
Do not store flammables in enclosed space, next to stairways or near an exit.
-
Check gauges for lack of flow.
-
No repairs within 10' of leads.
-
Proper warning signs posted?
-
Adequate fire watch precautions taken?
Electrical
-
Extension cords being connected to a Ground Fault Circuit Interrupter(GFCI) ?
-
Ground plugs intact?
-
Tools grounded or double insulated?
-
Guards are in place?
-
Extension cords are in good conditions?
Scaffold
-
Footing must be sound no 2"x4"s or bricks.
-
Scaffold over 10' requires safety rails or being tied off.
-
Safety rails required on perry's at 6'.
-
All working areas of a scaffold must be fully planked.
-
All braces must be in place.
-
Scaffold sections must be pinned to avoid an uplift.
-
No riding on mobile scaffolds(skate boarding).
-
Base plates must be used when no casters are used.
-
Competent person on site? If no please explain?
-
Identify competent person.
-
All casters must have brakes.
Personal Protection Equipment (PPE)
-
Hard hats being worn?
-
Ear plugs being used?
-
Safety glasses being worn? or side shields used with glasses?
-
Face shield & goggles being used when using chopsaw?
-
Welding hoods have no cracks or scratched lens?
-
Work boots being worn?
-
Sleeves on shirts (3" past shoulders)?
-
Harness-lanyards being used when required? Inspected before each use?
Fall Protection
-
100% tie off over 6'?
-
Safety rails needed on any open areas exposing a fall hazard?
-
Fall protection being used on articulating aerial lifts?
Ladders
-
All ladders must be tied off & set up to meet the 4 to 1 ratio.
-
Extension ladder extended 3' above ledge.
-
Proper use of a step/A-frame ladder.
-
Ladders must be be placed on a substantial base.
-
Ladders being inspected?
Powder Actuated Tools
-
License for all operators using powder actuated tools.
-
Proper disposal of misfire live rounds?
-
Proper disposal of all used loads?
-
Guns are properly stored?
-
All PPE & ear plugs being worn?
Documentation
-
Supervisor's safety meeting completed once a week?
-
Safety meeting signage sheet & topic turned in?
-
Foreman's daily report turned in?
-
MSDS, Hazcom & Safety Policy located with General Contractor?
-
Near miss reports turned in?
-
Are accidents reports turned into the office on the same day?
Superintendent or Forman conducting safety audit.
-
Add signature