Information
-
CO name
-
Location
-
Conducted on
-
Prepared by
OSPE information
-
OSPE name
-
OSPE phone number
-
OSPE e-mail
CO audit
-
Assigned relay rack number
-
Picture(s) of relay rack
-
Estimated length to vault knockout
-
Picture(s) of route
-
Vault length
-
Picture(s) of vault
-
Length vault to MH(s)
-
Picture(s) of MH(s)
-
Estimated length MH(s) to SL HHs
-
Pictures of proposed HH locations
Scope of work
-
Scope of work
-
Collector screen shot
Preterm information
-
Number of preterms needed
-
Preterm lengths
-
Preterm fiber counts
Sign off
-
Signature