Information
-
Job Name
-
SL job#
-
Conducted on
-
Location
-
Prepared by
-
Crew present
Construction
-
Scope of Work Completed
-
Start date
-
End date
Special construction
-
Scope of special construction
-
Pictures of special construction
Conduit
-
Was conduit installed to design specs?
-
Before, during and after trench pictures
-
Was a core bore performed?
-
Inside and outside before and after pictures
-
Were handholes placed?
-
Before, during and after handhole pictures
Fiber
-
Is there fiber run from SL to the customer demarc?
-
Pictures
-
Fiber Count
- 6
- 12
- 24
- 48
- 96
- 144
- 288
-
Fiber Type
- OFNG
- OFNR
- OFNP
- OFCG
- OFCR
- OFCP
- OPGW
- ADSS
-
Comments
-
Is there fiber run from the LEC demarc to the SL demarc? W/L only.
-
Pictures
Additional site comments
-
Any additional site comments?
-
Additional site pictures
Sign Off
-
Foreman signature