Title Page

  • Conducted on

  • Prepared by

  • Location
  • ROW access points are free from sediment, mud and foreign materials associated with pipeline construction?

  • ESC materials are readily available and accessible?

  • Site dust is minimised where possible and water trucks in use?

  • Clean water is being diverted around or through site with appropriate controls?

  • Soil scour and sediment are not present in drainage lines?

  • There is no erosion formed from site activities?

  • No additional erosion controls are required?

  • Mulch is stockpiled appropriately?

  • Soil stockpiles are away from drainage features and water course?

  • Sediment controls are installed, maintained and working correctly?

  • Dirty or sediment laden water is being contained where necessary and not directly discharged off site?

  • Any erosion or sediment controls required prior to ground disturbance are in place?

  • Sediment traps or sumps are not likely to exceed their capacity?

  • Sediment from temporary wash down bays is contained and disposed of adequately?

  • If a rain event is predicted, are additional erosion and sediment controls required and in place?

  • Soil management is in accordance with the Primary ESC Plan?

  • Progressive ESC Plans have been developed for implementation where required?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.