Title Page
-
Conducted on
-
Prepared by
-
Location
-
ROW access points are free from sediment, mud and foreign materials associated with pipeline construction?
-
ESC materials are readily available and accessible?
-
Site dust is minimised where possible and water trucks in use?
-
Clean water is being diverted around or through site with appropriate controls?
-
Soil scour and sediment are not present in drainage lines?
-
There is no erosion formed from site activities?
-
No additional erosion controls are required?
-
Mulch is stockpiled appropriately?
-
Soil stockpiles are away from drainage features and water course?
-
Sediment controls are installed, maintained and working correctly?
-
Dirty or sediment laden water is being contained where necessary and not directly discharged off site?
-
Any erosion or sediment controls required prior to ground disturbance are in place?
-
Sediment traps or sumps are not likely to exceed their capacity?
-
Sediment from temporary wash down bays is contained and disposed of adequately?
-
If a rain event is predicted, are additional erosion and sediment controls required and in place?
-
Soil management is in accordance with the Primary ESC Plan?
-
Progressive ESC Plans have been developed for implementation where required?