Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Footing, Foundation, And Reinforcement
-
Date of Inspection
-
BCLS Survey Received and Approved
-
Geotechnical Bearing letter Recieved
-
Soil conditions at footing level
-
Footing depths of not < 18" (frost)
-
Footing sizes and locations as per plan
-
Reinforcement as per engineering drawings
-
Wall Sizes and Locations
-
Other
-
Inspector Info
-
Inspection Status
-
Inspection Status
-
Inspection Status
Ground Work Plumbing
-
Date of Inspection
-
Water Test / Service
-
Water Test/ DWV/ Head Pressure
-
Supply Lines
-
Pressure Test
-
DWV ( Drain Waist Vent)
-
Vapour/Gas Barrier
-
Proper bedding and Slope
-
Clean out spacing and location
-
Other
-
Inspector Info
-
Inspection Status
-
Inspection Status
Under Slab Prep
-
Date of Inspection
-
Insulation Approved
-
Vapour barrier Approved
-
Reinforcing meets design
-
Other
-
Inspector Info
-
Inspection Status
-
Inspection Status
-
Inspection Status
Perimeter Drain, RWL, and Damp Proofing
-
Date of Inspection
-
Select date
-
Site drainage/Perimeter drainage
-
Type and size of drain pipe
-
Damproofing <br><br><br><br>
-
Dry well or Rain garden installed as per drainage plan
-
Pipe bedding and silt management
-
Acceptable leader locations
-
Acceptable Fittings and Assembly
-
Registered professional inspection report
-
Other
-
Add signature
-
Inspection Status
-
Inspection Status
-
Inspection Status
On-Site Services ( Sanitary, Storm, Water, Sump)
-
Select date
-
Depth of pipe below frost line
-
Pipe material and bedding
-
Connections and water test
-
Meter box inspection
-
Water Line Inspection/Sizing
-
Storm inspection
-
Sanitary inspection
-
Water on/off
-
Perimeter Drainage
-
Rain Water Leaders
-
Pre Slab inspection
-
Other
-
Add signature
-
Inspection Status
-
Inspection Status
-
Inspection Status
Rough-in Plumbing
-
Select date
-
Piping, slope, materials and sizing
-
Pipe layout and arrangement
-
Pipe Support and protection
-
Water Pressure test
-
Trap primers where required
-
Check valve assemblies
-
Venting <br>
-
1 -3" vent pipe through all floors
-
Pressure tests 200 lbs
-
Piping material approved<br>
-
Piping support
-
Plumbers declaration
-
Freeze protection
-
Other
-
Add signature
-
Inspection Status
-
Inspection Status
-
Inspection Status
Sheathing
-
Date of Inspection
-
Penetrations properly sealed
-
Nailing patterns as per engineering
-
Windows to be properly sealed and flashed before paper
-
Windows to be installed as per manufactures specification
-
Add signature
-
Inspection Status
-
Inspection Status
-
Inspection Status
Framing
-
Select date
-
Registered professional inspection reports
-
Sealed truss drawings
-
Stamped drawings on site for inspection
-
Roof truss/rafter/joist installation and bracing
-
Roof beam construction and assembly
-
Roof sheathing
-
Roof ventilation
-
Roof point loads to foundation
-
Attic access ( quote code reference)
-
Exhaust fan insulated and terminated
-
Wall Framing<br>materials,<br>,spacing openings<br>,lintels,
-
Fire blocking/fire stop
-
Loads carried down to foundation
-
Sill plates separated from concrete and hold downs
-
Cut notched and drilled members
-
Door and window rough-in sizes
-
Stair construction: rise/run/headroom
-
Smoke alarm locations, rough in locations
-
Fireplace: framing/clearances
-
Masonry chimneys for solid fuel: liners and clean-outs
-
Confirm fire dampers are located in duct at fire seperations
-
Ramps, slopes, accessibility
-
Height of foundation walls above grade
-
Mechanical Protection or Siding before Insulation
-
Other
-
Add signature
-
Inspection Status
-
Inspection Status
-
Inspection Status
Tubs and Shower Tests
-
Date of Inspection
-
Tubs And Showers
-
Traps Installed
-
Water Tight assemblies
-
Other
-
Add signature
-
Inspection Status
-
Inspection Status
-
Inspection Status
Insulation/ Vapour barrier
-
Select date
-
RSI value, type and installation
-
Cross ventilation
-
Continuous vapor barrier
-
Sealed at all openings and plates
-
Insulation installed over the entire face of the insulated area.
-
Other
-
Add signature
-
Inspection Status
-
Inspection Status
-
Inspection Status
Radiant Floor Heating Assemblies
-
Date of Inspection
-
Engineer specifications and heat loss calculations submitted
-
Pipe work
-
Add signature
-
Inspection Status
-
Inspection Status
-
Inspection Status
Occupancy Inspection
-
Select date
-
Application complete
-
Schedules/ Field reports/Insurance
-
Electrical final inspection<br>
-
Gas Final inspection
-
Final Survey
-
Substantial Completion
-
Title requirements met
-
Life safety concerns completed
-
Building Access/Egress
-
Code Compliance
-
Plumbers Declaration recieved
-
Other
-
Occupancy Approved
-
Add signature
-
Inspection Status
-
Inspection Status
-
Inspection Status
Final
-
Date of Inspection
-
Lot Grading
-
Curb and Sidewalk inspection
-
All outstanding documents received
-
Other
-
Final Approval
-
Add signature
-
Inspection Status
-
Inspection Status
-
Inspection Status