Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Add location

Footing, Foundation, And Reinforcement

  • Date of Inspection

  • Registered professional inspection reports

  • BCLS Survey Received and Approved

  • Geotechnical Field Review Recieved

  • Soil conditions at footing level

  • Footing depths of not < 18" (frost)

  • Footing sizes and locations as per plan

  • Reinforcement as per engineering drawings

  • Other

  • Other

  • Inspector Info

  • Inspection Status

Ground Work Plumbing

  • Date of Inspection

  • Water Test

  • Pressure Test

  • DWV ( Drain Waist Vent)

  • Vapour/Gas Barrier

  • Proper bedding and Slope

  • Clean out spacing and location

  • Other

  • Other

  • Inspection Status

  • Inspector Info

Under Slab Prep

  • Date of Inspection

  • Insulation Approved

  • Vapour barrier Approved

  • Reinforcing meets design

  • Other

  • Other

  • Inspector Info

  • Inspection Status

Perimeter Drain, RWL, and Damp Proofing

  • Select date

  • Site drainage/Perimeter drainage

  • Type and size of drain pipe

  • Damproofing to finished grade

  • Dry well or Rain garden installed as per drainage plan

  • Pipe bedding and silt management

  • Acceptable leader locations

  • Registered professional inspection report

  • Other

  • Other

  • Add signature

  • Inspection Status

On-Site Services ( Sanitary, Storm, Water, Sump)

  • Select date

  • Depth of pipe below frost line

  • Pipe material and bedding

  • Connections and water test

  • Meter box inspection

  • Water Line Inspection/Sizing

  • Storm inspection

  • Sanitary inspection

  • Water on/off

  • Perimeter Drainage

  • Rain Water Leaders

  • Pre Slab inspection

  • Other

  • Other

  • Add signature

  • Inspection Status

Rough-in Plumbing

  • Select date

  • Piping, slope, materials and sizing

  • Pipe layout and arrangement

  • Pipe Support and protection

  • Water Pressure test

  • Trap primers where required

  • Check valve assemblies

  • Venting <br>

  • 1 -3" vent pipe through all floors

  • Pressure tests 200 lbs

  • Piping material approved<br>

  • Piping support

  • Plumbers declaration

  • Freeze protection

  • Other

  • Other

  • Add signature

  • Inspection Status

Sheathing

  • Select date

  • Penetrations properly sealed

  • Nailing patterns as per engineering

  • Windows to be properly sealed and flashed before paper

  • Other

  • Other

  • Add signature

  • Inspection Status

  • Windows to be installed as per manufactures specification

  • Other

Framing

  • Select date

  • Registered professional inspection reports

  • Sealed truss drawings

  • Stamped drawings on site for inspection

  • Roof truss/rafter/joist installation and bracing

  • Roof beam construction and assembly

  • Roof sheathing

  • Roof ventilation

  • Roof point loads to foundation

  • Attic access ( quote code reference)

  • Exhaust fan insulated and terminated

  • Wall Framing<br>materials,<br>,spacing openings<br>,lintels,

  • Fire blocking/fire stop

  • Loads carried down to foundation

  • Sill plates separated from concrete and hold downs

  • Cut notched and drilled members

  • Door and window rough-in sizes

  • Stair construction: rise/run/headroom

  • Smoke alarm locations, rough in locations

  • Fireplace: framing/clearances

  • Masonry chimneys for solid fuel: liners and clean-outs

  • Confirm fire dampers are located in duct at fire seperations

  • Ramps, slopes, accessibility

  • Height of foundation walls above grade

  • Mechanical Protection or Siding before Insulation

  • Other

  • Other

  • Add signature

  • Inspection Status

Tubs and Shower Tests

  • Tubs And Showers

  • Traps Installed

  • Water Tight assemblies

  • Other

  • Other

  • Add signature

  • Inspection Status

Insulation/ Vapour barrier

  • Select date

  • RSI value, type and installation

  • Cross ventilation

  • Continuous vapor barrier

  • Sealed at all openings and plates

  • Insulation installed over the entire face of the insulated area.

  • Other

  • Other

  • Add signature

  • Inspection Status

Radiant Floor Heating Assemblies

  • Engineer specifications and heat loss calculations submitted

  • Pipe work

  • Other

  • Add signature

  • Inspection Status

Occupancy Inspection

  • Select date

  • Application complete

  • Schedules/ Field reports/Insurance

  • Electrical final inspection<br>

  • Gas Final inspection

  • Final Survey

  • Substantial Completion

  • Title requirements met

  • Life safety concerns completed

  • Building Access/Egress

  • Code Compliance

  • Other

  • Other

  • Occupancy Approved

  • Add signature

  • Inspection Status

Final

  • Select date

  • Lot Grading

  • Curb and Sidewalk inspection

  • All outstanding documents received

  • Other

  • Other

  • Final Approval

  • Add signature

  • Inspection Status

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.