Footing inspection

  • Select date

  • Soil conditions at footing level

  • Footing depths of not < 18" (frost)

  • Footing sizes and locations as per plan

  • Registered professional inspection reports

  • Reinforcement as per engineering drawings

  • Other

  • Add signature

Damproofing/Drain tile inspection

  • Select date

  • Site drainage plan

  • Damproofing to finished grade

  • Type and size of drain pipe

  • Dry well or Rain garden installed as per drainage plan

  • Pipe bedding and silt management

  • Acceptable leader locations

  • Registered professional inspection report

  • Other

  • Add signature

Services connection

  • Select date

  • Depth of pipe below frost line

  • Pipe material and bedding

  • Connections and water test

  • Meter box inspection

  • Water inspection

  • Water on/off

  • Storm inspection

  • Sanitary inspection

  • Other

  • Add signature

Rough in Plumbing

  • Select date

  • Piping, slope, materials and sizing

  • Pipe layout and arrangement

  • Pipe Support and protection

  • Water Pressure test

  • Trap primers where required

  • Check valve assemblies

  • Venting <br>

  • 1 -3" vent pipe through all floors

  • Plumbers declaration

  • Other

  • Add signature

Water distribution

  • Select date

  • Pressure tests 200 lbs

  • Piping material approved<br>

  • Piping support

  • Freeze protection

  • Other

  • Add signature

Framing

  • Select date

  • Registered professional inspection reports

  • Sealed truss drawings

  • Stamped drawings on site for inspection

  • Roof truss/rafter/joist installation and bracing

  • Roof beam construction and assembly

  • Roof sheathing

  • Roof ventilation

  • Roof point loads to foundation

  • Attic access ( quote code reference)

  • Exhaust fan insulated and terminated

  • Wall Framing<br>materials,<br>,spacing openings<br>,lintels,

  • Fire blocking/fire stop

  • Loads carried down to foundation

  • Sill plates separated from concrete and hold downs

  • Cut notched and drilled members

  • Door and window rough-in sizes

  • Stair construction: rise/run/headroom

  • Smoke alarm locations, rough in locations

  • Fireplace: framing/clearances

  • Masonry chimneys for solid fuel: liners and clean-outs

  • Confirm fire dampers are located in duct at fire seperations

  • Ramps, slopes, accessibility

  • Height of foundation walls above grade

  • Mechanical Protection or Siding before Insulation

  • Other

  • Add signature

Insulation/ Vapour barrier

  • Select date

  • RSI value, type and installation

  • Cross ventilation

  • Continuous vapor barrier

  • Sealed at all openings and plates

  • Other

  • Add signature

Occupancy Inspection

  • Select date

  • Application complete

  • Schedules/ Field reports/Insurance

  • Electrical final inspection<br>

  • Gas Final inspection

  • Final Survey

  • Building Access/Egress

  • Other

  • Occupancy Approved

  • Add signature

Final

  • Lot Grading

  • Curb and Sidewalk inspection

  • All outstanding documents received

  • Other

  • Final Approval

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.