Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Basic Information
-
Date and Time of Inspection
-
Dragline
-
Location
- R2
- R4
- R8
- R9
- R10
- R11
- R12
- R13
- R14
- R15
- R16
-
Operators
-
Signature
Plan Compliance
-
Bench Width and RL
-
Bench RL on Design
-
Highwall Crest Position
-
Highwall Toe Position
-
Key Width as Designed
-
Lowwall Catch Berm as Designed
-
Lawwall Crest Position
-
Lowwall Toe Position
-
Pit Position / Block Line
-
Compliant to 3D Dig Position / Page
-
Ramp Width and Grade
-
Coal Edge Correct
-
Sump in Place and Operational
-
Photos Taken of Hard Blast
Dozer Requirements
-
Elevated Bench Pushed Off
-
Coal Cleaned Up
-
Key Pushed Down / Dozer on Wall
-
Bunding in Place to Standard
-
Drainage Installed
-
Bench Prep Completed
-
Machine White Board Completed
General Comments
-
General Comments