Title Page
SRM Rescue Monday Night Shift Duties
-
Site
-
Conducted on
-
What Crew are Completing the Checks
Monday Night Shift Duties
Rescue 3
-
4 x 38mm Hose Visual Check
-
PRESSURE TEST DUE : MAY 2019
-
4 x 64mm Hose Visual Check
-
PRESSURE TEST DUE : MAY 2019
-
Medtronic AED (SN:35136748) Tested
-
ANNUAL INSPECTION DUE : MARCH 2019
-
AED Pads Checked
-
EXPIRY DATE : MARCH 2020
-
Burn Aid Kit Checked
-
EXPIRY DATE : SEPTEMBER 2020
-
Oxy Viva Kit and Cylinder Checked
-
ANNUAL INSPECTION DUE : MARCH 2019
-
All other Fire Fighting Branches and Equipment is Functioning Correctly
-
All First Aid Equipment and Bags are Sealed
Rescue 4
-
2 x 38mm Hose Visual Check
-
PRESSURE TEST DUE : MAY 2019
-
1 x 64mm Hose Visual Check
-
PRESSURE TEST DUE : MAY 2019
-
Medtronic AED (SN:35136748) Tested
-
ANNUAL INSPECTION DUE : MARCH 2019
-
AED Pads Checked
-
EXPIRY DATE : MARCH 2020
-
Oxy Viva Kit and Cylinder Checked
-
ANNUAL INSPECTION DUE : MARCH 2019
-
All other Fire Fighting Branches and Equipment is Functioning Correctly
-
All First Aid Equipment and Bags are Sealed
Other Duties
-
Medtronic Training AED (SN:3201804) Checked
-
ANNUAL INSPECTION DUE : MARCH 2019
-
SRM Rescue Equipment Full Inventory has been updated with all information and movements
-
Inspect Helipad and Everything is in Working Order
Security Patrol
-
Time crew starts Security Patrol
-
Peak Downs boundary gate checked
-
Ramp 4 Fuel Farm checkedT
-
Lake Vermont TAMs Gate 1
-
Lake Vermont TAMs Gate 2
-
Ramp 13 Fuel Farm checked
-
Top car park
-
Wide load gate
-
One mile dam gate
-
Airstrip gate
-
Bottom car park
-
Time crew completed Security Patrol
Site Access Centre Duties
-
All Visitors have been entered into TAMs for tomorrow
-
All Work Area Familiarisation (WAF's) have been put on visitor card, profile has been checked & manual Drug & Alcohol test put on profile.
-
Manual Drug & Alcohol tests added to required profiles
-
Add signature