Title Page

SRM Rescue Saturday Day Shift Duties

  • Site

  • Conducted on

  • What Crew are Completing the Checks

Saturday Night Duties

Rescue 3

  • Inspect Holmatro Hydraulic Lines

  • Connect Spreaders to hydraulic line and cycle through full ROM

  • Connect Cutters to hydraulic line and cycle through full ROM

  • Connect RAM to hydraulic line and cycle through full ROM

  • Connect Pedal Cutter to hydraulic line and cycle through full ROM

  • Re Fuel Hydraulic Pump, Check Engine & Hydraulic oil levels

Rescue 4

  • Inspect Holmatro Hydraulic Lines

  • Connect Spreaders to hydraulic line and cycle through full ROM

  • Connect Cutters to hydraulic line and cycle through full ROM

  • Connect RAM to hydraulic line and cycle through full ROM

Security Patrol

  • Time crew starts Security Patrol

  • Peak Downs boundary gate checked

  • Ramp 4 Fuel Farm checkedT

  • Lake Vermont TAMs Gate 1
  • Lake Vermont TAMs Gate 2
  • Ramp 13 Fuel Farm checked

  • Top car park

  • Wide load gate

  • One mile dam gate

  • Airstrip gate

  • Bottom car park

  • Time crew completed Security Patrol

Site Access Centre Duties

  • All Visitors have been entered into TAMs for tomorrow

  • All Work Area Familiarisation (WAF's) have been put on visitor card, profile has been checked & manual Drug & Alcohol test put on profile.

  • Manual Drug & Alcohol tests added to required profiles

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.