Title Page
SRM Rescue Saturday Day Shift Duties
-
Site
-
Conducted on
-
What Crew are Completing the Checks
Saturday Night Duties
Rescue 3
-
Inspect Holmatro Hydraulic Lines
-
Connect Spreaders to hydraulic line and cycle through full ROM
-
Connect Cutters to hydraulic line and cycle through full ROM
-
Connect RAM to hydraulic line and cycle through full ROM
-
Connect Pedal Cutter to hydraulic line and cycle through full ROM
-
Re Fuel Hydraulic Pump, Check Engine & Hydraulic oil levels
Rescue 4
-
Inspect Holmatro Hydraulic Lines
-
Connect Spreaders to hydraulic line and cycle through full ROM
-
Connect Cutters to hydraulic line and cycle through full ROM
-
Connect RAM to hydraulic line and cycle through full ROM
Security Patrol
-
Time crew starts Security Patrol
-
Peak Downs boundary gate checked
-
Ramp 4 Fuel Farm checkedT
-
Lake Vermont TAMs Gate 1
-
Lake Vermont TAMs Gate 2
-
Ramp 13 Fuel Farm checked
-
Top car park
-
Wide load gate
-
One mile dam gate
-
Airstrip gate
-
Bottom car park
-
Time crew completed Security Patrol
Site Access Centre Duties
-
All Visitors have been entered into TAMs for tomorrow
-
All Work Area Familiarisation (WAF's) have been put on visitor card, profile has been checked & manual Drug & Alcohol test put on profile.
-
Manual Drug & Alcohol tests added to required profiles
-
Add signature