Title Page
-
Conducted on
-
Prepared by
-
WTG
LMRA - GOLDEN SAFETY RULES
-
GOLDEN SAFETY RULES
-
1. STOP, THINK and ACT
-
2. I am in GOOD CONDITION and WELL EQUIPPED
-
3. I Take care of GOOD HOUSEKEEPING
-
4. I KNOW and RESPECT instructions and procedures
-
5. I COMMUNICATE, COOPERATE and CARE
LAST MINUTE RISK ASSESSMENT
-
Do we have the right permit and instructions?
-
Do we have the right tools and equipment?
-
Necessary PPE/CPE present and in good condition?
-
Are risks tackled so they are as low as reasonable practicable?
-
Do we have the correct information or training?
-
In case of hot works, do we have the correct permit?
-
Are the weather conditions acceptable?
EXTRA QUESTIONS
-
Communication lines checked & number of UHF radios present ok?
-
Evaluation made of PPE needed for the job? (e.g. type of mask correct?Helmet required?)
-
Other safety hazards or remarks? (REPORT ALL HAZARDS IN A SHOC)
-
Needed actions when one or more answers is no (STOP-THINK-ACT)
CONFIRMATION OF TOOLBOX TALK AND PRESENTATION OF METHOD STATEMENT
-
1. Name
-
2. Name
-
3. Name
-
4. Name
-
5. Name
-
6. Name
-
7. Name
-
8. Name
COMPLETE THE LOGBOOK ON THE DESK IN THE NACELLE: REMINDER WHEN LEAVING THE TURBINE
-
Do not forget to complete the logbook in the nacelle