Information
-
(Revision 06-2013)
-
Name and Address of Project
-
Name of Team Leader
-
# of Employees
-
Date Audit Performed
-
Prepared by
Fall Protection
-
Fall Protection Required
-
Add media
-
Guard Rail
-
Add media
-
Top Rail, 42 inches (+ / - 3) above working surface.
-
Mid Rail, 21 inches (+ / - 3) above working surface.
-
Toe-board for work above 10 ft.
-
Add media
-
Rope Inspected
-
Harness Inspected
-
Lanyard Inspected
-
Anchor Installed as required by Manufacturer, PE, or Qualified Person.
-
Add media
-
34 - 39 Inches Above Working Surface.
-
Flagging Every 6 Ft.
-
Stands can Withstand 16 lbs. of Tipping Force.
-
Rope is Stronger than 500 lbs. Tensile Strength.
-
Warning Line 6 - 10 Feet Away from Fall Hazards.
-
Fall Arrest, Fall Restraint, or Safety Monitor Used for Work Outside Warning Line.
-
Add media
-
On Same Level as Work.
-
Can Communicate with Exposed Employees.
-
Is not Distracted by Other Duties.
-
Has been Trained and is Authorized to Stop Unsafe Work or Behaviors.
-
Has on High Visibility Vest.
-
Monitors behind Warning Line & Communicates with Employees.
Ladder Set-up
-
Fixed Stairs
-
Fixed Ladder
-
Secured to Wall or Structure
-
Safe to Climb
-
Extension Ladder Used
-
Has inspection tag.
-
Missing, bent, or broken parts
-
Missing fly rope.
-
3 ft. above landing or eave.
-
Secured at top.
-
Secured at bottom.
-
Add media
PPE
-
Hearing Protection Required for Loud Noises.
-
Hard Hat worn for overhead hazards and work.
-
Longs Pants Required for Hot Work
-
Long Sleeved Shirt Required for Hot Work
-
Respirator Required.
-
Safety Glasses
-
Worn for tear off.
-
Worn for other eye hazards.
-
PPE worn correctly.
-
Wrong PPE for Protection.
-
Add media
Electrical
-
Wires inspected.
-
GFCI Used for Temporary Power Sources.
-
Work Remains 20 feet Away from Electrical Lines
-
Covers Required for Electrical Lines.
-
Does Power Need to be Removed or Turned Off
Material Hoisting
-
Nails Bent or Removed from Boards.
-
Trash Chute or Hoisting Used for Elevated Projects (20 feet or more)
-
Add media
-
Overhead Work Signs Posted.
-
Pallets Not Stacked More than 2 High
-
Hoisting
-
Forklift Operator Trained.
-
Rigger Trained and Communicates with Operator.
-
Signal Person Trained and Communicates with Operator.
-
Crane Operator Trained.
-
Daily Inspection Performed.
-
Add media
-
Rigging Equipment and Materials are Serviceable for Operations.
-
Signal Person Trained and Communicates with Operator.
-
Flagging or Warning Lines Around Crane and Lift Area.
-
Taglines Used for Material or Equipment Control.
General Liability
-
Roof Tie-in Performed Daily.
-
Plugs Removed from Drains.
-
Work logged Daily in a Journal.
-
Site or Project Inspected for Previous Damage.
-
Caution Signs Posted.
-
Add media
Fire Prevention
-
Extinguishers within 25 - 50 feet of Work.
-
Used / Spent Extinguishers removed from Project or Site.
-
Gas Cans Labeled and Stored.
-
Screen Located Within Gas Cans.
-
Add media
Emergency Readiness
-
First Aid Kit (with Eye Wash Bottle) On-Site and Available to Employees.
-
HAZCOM Manual On-Site and Available to Employees.
-
Safety Manual On-Site and Available to Employees.
-
Add media
Scaffold.
-
Scaffold Required
-
Scaffold has Hoist for Materials.
-
Access Secured at Night.
-
Inspected by Competent Person.
-
Scaffold has Green Tag for Use.
-
Scaffold is level.
-
4:1 Ratio and Tied to Building (Push / Pull)
-
Walk Boards Bent.
-
Add media
Safety Talks
-
Performed Weekly, Signed & Turned In