Information
-
Document No.
-
Project Name
-
Project Location
-
Prepared by
-
Ohio EPA General Stormwater Permit No.
-
Sediment Control Contractor
-
Phone Number
-
Date of First Grubbing/Clearing Activity
-
Date Sediment Controls Implemented (within 7 days of grubbing)
-
Date Sediment/Erosion Controls Implemented in accordance with Stormwater Pollution Prevention Plan
-
Are there any streams/creeks on site? (Y/N)
-
Identify steps taken to protect streams/creeks
-
Inspection of all sediment control measures MUST be performed at least once every seven days and within 24 hours of .25" rainfall. Part 4.1.4 of permit
-
Conducted on
-
Type of BMP (silt fence, dandy bags, etc.)
-
24 Hour Rainfall
-
Sediment & Erosion Controls Functional
-
Corrective Action Needed
-
Date Corrective Action Completed
-
Additional Measures Necessary (if so, describe)
-
Inspector Initials
-
Are all areas stabalized?
-
Are natural resources protected (streams, wetlands, etc,)?
-
Are perimeter controls adequately installed?
-
Are storm drains properly protected?
-
Is there evidence of sediment being tracked in the street?
-
Is trash collected and placed in dumpsters?
-
Is the washout facility functional?
-
Are equipment fueling areas free of spills and leaks?
-
Comments