Information

  • Document No.

  • Project Name

  • Project Location
  • Prepared by

  • Ohio EPA General Stormwater Permit No.

  • Sediment Control Contractor

  • Phone Number

  • Date of First Grubbing/Clearing Activity

  • Date Sediment Controls Implemented (within 7 days of grubbing)

  • Date Sediment/Erosion Controls Implemented in accordance with Stormwater Pollution Prevention Plan

  • Are there any streams/creeks on site? (Y/N)

  • Identify steps taken to protect streams/creeks

  • Inspection of all sediment control measures MUST be performed at least once every seven days and within 24 hours of .25" rainfall. Part 4.1.4 of permit

  • Conducted on

  • Type of BMP (silt fence, dandy bags, etc.)

  • 24 Hour Rainfall

  • Sediment & Erosion Controls Functional

  • Corrective Action Needed

  • Date Corrective Action Completed

  • Additional Measures Necessary (if so, describe)

  • Inspector Initials

  • Are all areas stabalized?

  • Are natural resources protected (streams, wetlands, etc,)?

  • Are perimeter controls adequately installed?

  • Are storm drains properly protected?

  • Is there evidence of sediment being tracked in the street?

  • Is trash collected and placed in dumpsters?

  • Is the washout facility functional?

  • Are equipment fueling areas free of spills and leaks?

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.