Information

  • DA/CDC/CC Number

  • Client / Site

  • Location
  • Conducted on

  • Health and Building Surveyor

1. Ongoing Matters

  • 1.1. Builder's sign

  • 1.2. Sediment and erosion controls

  • 1.3. Rubbish control

  • 1.4. Builder's toilet

  • 1.5. Protection of public space by fence or hoarding

  • 1.6. Protection and support of adjoining buildings

2. Health & Building Surveyor's Checklist

  • 2.1. Pits in courtyards junctions and changes in direction and low areas

  • 2.2. Spreaders on upper roof areas

  • 2.3. Cleaning junctions/inspection openings (where fall is less than 1:60)

  • 2.4. Minimum fall 1:100

  • 2.5. Cover to pipes minimum 300mm unless protected under pavement (excluding footpath)

  • 2.6. Sewer grade UPVC, earthenware across footpath

  • 2.7. Licensed plumber

  • 2.8. Plumber on site

  • 2.9. Location in respect of property boundaries and easements

  • 2.10. Correct grade/fall

  • 2.11. Separation from other services

  • 2.12. Approved material

  • 2.13. Bedding, side support, overlay material

  • 2.14. Filled ground

  • 2.15. Sufficient down pipes and size

  • 2.16. Connection to existing

  • 2.17. Connection to main

  • 2.18. Connection to street gutter

  • 2.19. Provision of surface water sumps

  • 2.20. Subsoil drains (separate to roof water)

  • 2.21. Plot approximate position on site plan

  • 2.22. Sticker left

3. Comments

  • 3.1. Results

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.