Information
-
Project Name
-
Company
-
Permit Number
-
Stream Number
-
Pre-Construction Classification
-
Inspected By
-
Conducted on
-
All items must be inspected and documented. Attach photos to the appropriate category.
Inspection Type
-
One Month Review
-
Full Growing Season Review
Current Weather On Site- check all that apply
-
Sunny
-
Overcast/Cloudy
-
Rainy
Site Restoration
-
Have the stream banks and adjacent contours been restored to pre-construction conditions?
-
Has the stream channel been restored to pre-construction grade?
-
Current stream bank stability
-
Was the stream channel substrate segregated and replaced?
-
Were trench plugs installed per the permitted drawing?
-
Has excess fill material been removed?
-
Have erosion and sedimentation controls been removed?
-
Has vegetation been restored to pre-construction conditions?
-
Has pre-construction hydrology been restored?
-
Describe any changes to stream function and/or value.
-
Additional Comments/Observations
-
Sketch
-
Inspector/Observer Signature: (required)