Information

  • Project Name

  • Company

  • Permit Number

  • Stream Number

  • Pre-Construction Classification

  • Inspected By

  • Conducted on

  • All items must be inspected and documented. Attach photos to the appropriate category.

Inspection Type

  • One Month Review

  • Full Growing Season Review

Current Weather On Site- check all that apply

  • Sunny

  • Overcast/Cloudy

  • Rainy

Site Restoration

  • Have the stream banks and adjacent contours been restored to pre-construction conditions?

  • Has the stream channel been restored to pre-construction grade?

  • Current stream bank stability

  • Was the stream channel substrate segregated and replaced?

  • Were trench plugs installed per the permitted drawing?

  • Has excess fill material been removed?

  • Have erosion and sedimentation controls been removed?

  • Has vegetation been restored to pre-construction conditions?

  • Has pre-construction hydrology been restored?

  • Describe any changes to stream function and/or value.

  • Additional Comments/Observations

  • Sketch

  • Inspector/Observer Signature: (required)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.