Title Page
-
Site
-
Lot Number
-
Repair Number
-
Conducted on
-
Prepared by
Post-Repair Checklist
-
1. Provide the Pre-repair structural checklist number/reference.
-
2. Is the Surface Treatment Refurbishment ITP completed and signed off with no open NCRs?
-
3. Is this checklist referenced in the area Structural ITP?
-
4. Photo Evidence captured and filed in an auditable manner (Photos and details captured in a photo register for each structural ITP)
-
5. NCR register complete and filed in project folder
-
Please send this Post Repair Checklist to the certifying engineer for approval.