Title Page
-
Site conducted
-
Project Number
-
Conducted on
-
Prepared by
-
Location
Structural Steel Inspection
-
Base plates at correct elevation?
-
Base plates at correct NS & EW location?
-
Column hold down nuts and washers in place and torqued?
-
Columns plumb in all directions?
-
Horizontal steel framing at correct elevation?
-
Bolted connections properly torqued using correct bolting material?
-
Plate washers provided to cover long slotted holes as required?
-
Weld filer material and completed weldment acceptable?
-
Post weld heat treatment complete and acceptable?
-
Welding nondestructive examination complete and acceptable?
-
Vertical and horizontal bracing complete and properly bolted?
-
Exterior siding supports installed correctly?
-
Temporary supports and brackets removed from structure?
-
Miscellaneous steel (ladders, platforms, etc.) properly installed?
-
Grouting completed?
-
Coatings touched up as required?
-
Fire proofing repaired as required?
-
PERFORMED BY:
-
DATE: