Title Page

  • Report Number

  • Project Name

  • Date of Inspection

  • Project Number

  • Location
  • P.O. Number

  • Prepared by

  • Inspector’s Signature

Inspection Items

Inspection Item 1

  • Inspection Type

  • Type of Bolt(s)

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Comments/Description

  • Picture(s)

  • Do the bolt assemblies comply with RCSC requirements?

  • Description of deficiency(ies)

  • Specify grade of bolts installed.

  • Please specify

  • Specify grade of installed nuts

  • Specify grade of installed washers.

  • Location(s)/Grid Lines of deficiency(ies)

  • Do the bolt assemblies comply with project requirements?

  • Description of deficiency(ies)

  • Please specify

  • Location(s)/Grid Lines of deficiency(ies)

  • Required bolt tensioning method.

  • Method of pretensioning used

  • Have the twist-off splines been correctly severed?

  • Have the bolt assemblies been properly match-marked and turned per RCSC Table 8.2?

  • Have the bolt assemblies been properly tensioned per RCSC Table 8.1?

  • Is the appropriate feeler gage refused entry in at least half of the spaces between the protrusions?

  • Are the DTI protrusions facing away from the connecting plies?

  • (Snug-Tight) Have the plies of the connected elements been brought into firm contact as described in RCSC?

  • (Snug-Tight) Have the bolt assemblies been tightened sufficiently to prevent the turning of the nuts without use of a wrench?

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Specify Bolt Inspection Type

  • Comments/Description

  • Picture(s)

  • Accept/Reject

  • Location(s)/Grid Lines of deficiency(ies).

  • Location(s)/Grid Lines of deficiency(ies).

  • Weld Category

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Type of fasteners used at supporting steel.

  • Does the visual quality and placement of the arc spot welds comply with the contract drawings and AWS D1.3 (2018), Section 8.1.1?

  • Describe the arc spot weld deficiency(ies).

  • Required Weld Pattern/Spacing

  • Please specify the required weld pattern/spacing.

  • Installed Weld Pattern/Spacing

  • Please specify the installed weld pattern/spacing.

  • Type of Mechanical Fasteners

  • Hilti Fastener Type

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Describe the type of Hilti fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Type of Simpson Strong-Tie Fastener.

  • Describe the type of Simpson Strong-Tie Fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Specify type of mechanical fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Description of the connection type(s)

  • Does the installation of the connection(s) comply with the contract drawings, manufacturer's recommendations, applicable code section?

  • Description of the deficiency.

  • Location(s)/Grid Lines of the deficiency(ies).

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Do the installed conditions comply with the contract drawings, AWS D1.1, AISC, and ACI requirements?

  • Please specify the type of deficiency(ies).

  • Please specify type of deficiency(ies).

  • Location(s)/Grid Lines of deficiency(ies).

  • Accept/Reject

  • Any other Item(s)/Area(s) inspected?

Inspection Item 2

  • Inspection Type

  • Type of Bolt(s)

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Comments/Description

  • Picture(s)

  • Do the bolt assemblies comply with RCSC requirements?

  • Description of deficiency(ies)

  • Specify grade of bolts installed.

  • Please specify

  • Specify grade of installed nuts

  • Specify grade of installed washers.

  • Location(s)/Grid Lines of deficiency(ies)

  • Do the bolt assemblies comply with project requirements?

  • Description of deficiency(ies)

  • Please specify

  • Location(s)/Grid Lines of deficiency(ies)

  • Required bolt tensioning method.

  • Method of pretensioning used

  • Have the twist-off splines been correctly severed?

  • Have the bolt assemblies been properly match-marked and turned per RCSC Table 8.2?

  • Have the bolt assemblies been properly tensioned per RCSC Table 8.1?

  • Is the appropriate feeler gage refused entry in at least half of the spaces between the protrusions?

  • Are the DTI protrusions facing away from the connecting plies?

  • (Snug-Tight) Have the plies of the connected elements been brought into firm contact as described in RCSC?

  • (Snug-Tight) Have the bolt assemblies been tightened sufficiently to prevent the turning of the nuts without use of a wrench?

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Specify Bolt Inspection Type

  • Comments/Description

  • Picture(s)

  • Accept/Reject

  • Location(s)/Grid Lines of deficiency(ies).

  • Location(s)/Grid Lines of deficiency(ies).

  • Weld Category

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Type of fasteners used at supporting steel.

  • Does the visual quality and placement of the arc spot welds comply with the contract drawings and AWS D1.3 (2018), Section 8.1.1?

  • Describe the arc spot weld deficiency(ies).

  • Required Weld Pattern/Spacing

  • Please specify the required weld pattern/spacing.

  • Installed Weld Pattern/Spacing

  • Please specify the installed weld pattern/spacing.

  • Type of Mechanical Fasteners

  • Hilti Fastener Type

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Describe the type of Hilti fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Type of Simpson Strong-Tie Fastener.

  • Describe the type of Simpson Strong-Tie Fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Specify type of mechanical fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Description of the connection type(s)

  • Does the installation of the connection(s) comply with the contract drawings, manufacturer's recommendations, applicable code section?

  • Description of the deficiency.

  • Location(s)/Grid Lines of the deficiency(ies).

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Do the installed conditions comply with the contract drawings, AWS D1.1, AISC, and ACI requirements?

  • Please specify the type of deficiency(ies).

  • Please specify type of deficiency(ies).

  • Location(s)/Grid Lines of deficiency(ies).

  • Accept/Reject

  • Any other Item(s)/Area(s) inspected?

Inspection Item 3

  • Inspection Type

  • Type of Bolt(s)

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Comments/Description

  • Picture(s)

  • Do the bolt assemblies comply with RCSC requirements?

  • Description of deficiency(ies)

  • Specify grade of bolts installed.

  • Please specify

  • Specify grade of installed nuts

  • Specify grade of installed washers.

  • Location(s)/Grid Lines of deficiency(ies)

  • Do the bolt assemblies comply with project requirements?

  • Description of deficiency(ies)

  • Please specify

  • Location(s)/Grid Lines of deficiency(ies)

  • Required bolt tensioning method.

  • Method of pretensioning used

  • Have the twist-off splines been correctly severed?

  • Have the bolt assemblies been properly match-marked and turned per RCSC Table 8.2?

  • Have the bolt assemblies been properly tensioned per RCSC Table 8.1?

  • Is the appropriate feeler gage refused entry in at least half of the spaces between the protrusions?

  • Are the DTI protrusions facing away from the connecting plies?

  • (Snug-Tight) Have the plies of the connected elements been brought into firm contact as described in RCSC?

  • (Snug-Tight) Have the bolt assemblies been tightened sufficiently to prevent the turning of the nuts without use of a wrench?

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Specify Bolt Inspection Type

  • Comments/Description

  • Picture(s)

  • Accept/Reject

  • Location(s)/Grid Lines of deficiency(ies).

  • Location(s)/Grid Lines of deficiency(ies).

  • Weld Category

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Type of fasteners used at supporting steel.

  • Does the visual quality and placement of the arc spot welds comply with the contract drawings and AWS D1.3 (2018), Section 8.1.1?

  • Describe the arc spot weld deficiency(ies).

  • Required Weld Pattern/Spacing

  • Please specify the required weld pattern/spacing.

  • Installed Weld Pattern/Spacing

  • Please specify the installed weld pattern/spacing.

  • Type of Mechanical Fasteners

  • Hilti Fastener Type

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Describe the type of Hilti fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Type of Simpson Strong-Tie Fastener.

  • Describe the type of Simpson Strong-Tie Fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Specify type of mechanical fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Description of the connection type(s)

  • Does the installation of the connection(s) comply with the contract drawings, manufacturer's recommendations, applicable code section?

  • Description of the deficiency.

  • Location(s)/Grid Lines of the deficiency(ies).

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Do the installed conditions comply with the contract drawings, AWS D1.1, AISC, and ACI requirements?

  • Please specify the type of deficiency(ies).

  • Please specify type of deficiency(ies).

  • Location(s)/Grid Lines of deficiency(ies).

  • Accept/Reject

  • Any other Item(s)/Area(s) inspected?

Inspection Item 4

  • Inspection Type

  • Type of Bolt(s)

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Comments/Description

  • Picture(s)

  • Do the bolt assemblies comply with RCSC requirements?

  • Description of deficiency(ies)

  • Specify grade of bolts installed.

  • Please specify

  • Specify grade of installed nuts

  • Specify grade of installed washers.

  • Location(s)/Grid Lines of deficiency(ies)

  • Do the bolt assemblies comply with project requirements?

  • Description of deficiency(ies)

  • Please specify

  • Location(s)/Grid Lines of deficiency(ies)

  • Required bolt tensioning method.

  • Method of pretensioning used

  • Have the twist-off splines been correctly severed?

  • Have the bolt assemblies been properly match-marked and turned per RCSC Table 8.2?

  • Have the bolt assemblies been properly tensioned per RCSC Table 8.1?

  • Is the appropriate feeler gage refused entry in at least half of the spaces between the protrusions?

  • Are the DTI protrusions facing away from the connecting plies?

  • (Snug-Tight) Have the plies of the connected elements been brought into firm contact as described in RCSC?

  • (Snug-Tight) Have the bolt assemblies been tightened sufficiently to prevent the turning of the nuts without use of a wrench?

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Specify Bolt Inspection Type

  • Comments/Description

  • Picture(s)

  • Accept/Reject

  • Location(s)/Grid Lines of deficiency(ies).

  • Location(s)/Grid Lines of deficiency(ies).

  • Weld Category

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Type of fasteners used at supporting steel.

  • Does the visual quality and placement of the arc spot welds comply with the contract drawings and AWS D1.3 (2018), Section 8.1.1?

  • Describe the arc spot weld deficiency(ies).

  • Required Weld Pattern/Spacing

  • Please specify the required weld pattern/spacing.

  • Installed Weld Pattern/Spacing

  • Please specify the installed weld pattern/spacing.

  • Type of Mechanical Fasteners

  • Hilti Fastener Type

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Describe the type of Hilti fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Type of Simpson Strong-Tie Fastener.

  • Describe the type of Simpson Strong-Tie Fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Specify type of mechanical fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Description of the connection type(s)

  • Does the installation of the connection(s) comply with the contract drawings, manufacturer's recommendations, applicable code section?

  • Description of the deficiency.

  • Location(s)/Grid Lines of the deficiency(ies).

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Do the installed conditions comply with the contract drawings, AWS D1.1, AISC, and ACI requirements?

  • Please specify the type of deficiency(ies).

  • Please specify type of deficiency(ies).

  • Location(s)/Grid Lines of deficiency(ies).

  • Accept/Reject

  • Any other Item(s)/Area(s) inspected?

Inspection Item 5

  • Inspection Type

  • Type of Bolt(s)

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Comments/Description

  • Picture(s)

  • Do the bolt assemblies comply with RCSC requirements?

  • Description of deficiency(ies)

  • Specify grade of bolts installed.

  • Please specify

  • Specify grade of installed nuts

  • Specify grade of installed washers.

  • Location(s)/Grid Lines of deficiency(ies)

  • Do the bolt assemblies comply with project requirements?

  • Description of deficiency(ies)

  • Please specify

  • Location(s)/Grid Lines of deficiency(ies)

  • Required bolt tensioning method.

  • Method of pretensioning used

  • Have the twist-off splines been correctly severed?

  • Have the bolt assemblies been properly match-marked and turned per RCSC Table 8.2?

  • Have the bolt assemblies been properly tensioned per RCSC Table 8.1?

  • Is the appropriate feeler gage refused entry in at least half of the spaces between the protrusions?

  • Are the DTI protrusions facing away from the connecting plies?

  • (Snug-Tight) Have the plies of the connected elements been brought into firm contact as described in RCSC?

  • (Snug-Tight) Have the bolt assemblies been tightened sufficiently to prevent the turning of the nuts without use of a wrench?

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Specify Bolt Inspection Type

  • Comments/Description

  • Picture(s)

  • Accept/Reject

  • Location(s)/Grid Lines of deficiency(ies).

  • Location(s)/Grid Lines of deficiency(ies).

  • Weld Category

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Type of fasteners used at supporting steel.

  • Does the visual quality and placement of the arc spot welds comply with the contract drawings and AWS D1.3 (2018), Section 8.1.1?

  • Describe the arc spot weld deficiency(ies).

  • Required Weld Pattern/Spacing

  • Please specify the required weld pattern/spacing.

  • Installed Weld Pattern/Spacing

  • Please specify the installed weld pattern/spacing.

  • Type of Mechanical Fasteners

  • Hilti Fastener Type

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Describe the type of Hilti fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Type of Simpson Strong-Tie Fastener.

  • Describe the type of Simpson Strong-Tie Fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Specify type of mechanical fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Description of the connection type(s)

  • Does the installation of the connection(s) comply with the contract drawings, manufacturer's recommendations, applicable code section?

  • Description of the deficiency.

  • Location(s)/Grid Lines of the deficiency(ies).

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Do the installed conditions comply with the contract drawings, AWS D1.1, AISC, and ACI requirements?

  • Please specify the type of deficiency(ies).

  • Please specify type of deficiency(ies).

  • Location(s)/Grid Lines of deficiency(ies).

  • Accept/Reject

  • Any other Item(s)/Area(s) inspected?

Inspection Item 6

  • Inspection Type

  • Type of Bolt(s)

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Comments/Description

  • Picture(s)

  • Do the bolt assemblies comply with RCSC requirements?

  • Description of deficiency(ies)

  • Specify grade of bolts installed.

  • Please specify

  • Specify grade of installed nuts

  • Specify grade of installed washers.

  • Location(s)/Grid Lines of deficiency(ies)

  • Do the bolt assemblies comply with project requirements?

  • Description of deficiency(ies)

  • Please specify

  • Location(s)/Grid Lines of deficiency(ies)

  • Required bolt tensioning method.

  • Method of pretensioning used

  • Have the twist-off splines been correctly severed?

  • Have the bolt assemblies been properly match-marked and turned per RCSC Table 8.2?

  • Have the bolt assemblies been properly tensioned per RCSC Table 8.1?

  • Is the appropriate feeler gage refused entry in at least half of the spaces between the protrusions?

  • Are the DTI protrusions facing away from the connecting plies?

  • (Snug-Tight) Have the plies of the connected elements been brought into firm contact as described in RCSC?

  • (Snug-Tight) Have the bolt assemblies been tightened sufficiently to prevent the turning of the nuts without use of a wrench?

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Specify Bolt Inspection Type

  • Comments/Description

  • Picture(s)

  • Accept/Reject

  • Location(s)/Grid Lines of deficiency(ies).

  • Location(s)/Grid Lines of deficiency(ies).

  • Weld Category

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Type of fasteners used at supporting steel.

  • Does the visual quality and placement of the arc spot welds comply with the contract drawings and AWS D1.3 (2018), Section 8.1.1?

  • Describe the arc spot weld deficiency(ies).

  • Required Weld Pattern/Spacing

  • Please specify the required weld pattern/spacing.

  • Installed Weld Pattern/Spacing

  • Please specify the installed weld pattern/spacing.

  • Type of Mechanical Fasteners

  • Hilti Fastener Type

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Describe the type of Hilti fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Type of Simpson Strong-Tie Fastener.

  • Describe the type of Simpson Strong-Tie Fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Specify type of mechanical fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Description of the connection type(s)

  • Does the installation of the connection(s) comply with the contract drawings, manufacturer's recommendations, applicable code section?

  • Description of the deficiency.

  • Location(s)/Grid Lines of the deficiency(ies).

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Do the installed conditions comply with the contract drawings, AWS D1.1, AISC, and ACI requirements?

  • Please specify the type of deficiency(ies).

  • Please specify type of deficiency(ies).

  • Location(s)/Grid Lines of deficiency(ies).

  • Accept/Reject

  • Any other Item(s)/Area(s) inspected?

Inspection Item 7

  • Inspection Type

  • Type of Bolt(s)

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Comments/Description

  • Picture(s)

  • Do the bolt assemblies comply with RCSC requirements?

  • Description of deficiency(ies)

  • Specify grade of bolts installed.

  • Please specify

  • Specify grade of installed nuts

  • Specify grade of installed washers.

  • Location(s)/Grid Lines of deficiency(ies)

  • Do the bolt assemblies comply with project requirements?

  • Description of deficiency(ies)

  • Please specify

  • Location(s)/Grid Lines of deficiency(ies)

  • Required bolt tensioning method.

  • Method of pretensioning used

  • Have the twist-off splines been correctly severed?

  • Have the bolt assemblies been properly match-marked and turned per RCSC Table 8.2?

  • Have the bolt assemblies been properly tensioned per RCSC Table 8.1?

  • Is the appropriate feeler gage refused entry in at least half of the spaces between the protrusions?

  • Are the DTI protrusions facing away from the connecting plies?

  • (Snug-Tight) Have the plies of the connected elements been brought into firm contact as described in RCSC?

  • (Snug-Tight) Have the bolt assemblies been tightened sufficiently to prevent the turning of the nuts without use of a wrench?

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Specify Bolt Inspection Type

  • Comments/Description

  • Picture(s)

  • Accept/Reject

  • Location(s)/Grid Lines of deficiency(ies).

  • Location(s)/Grid Lines of deficiency(ies).

  • Weld Category

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Type of fasteners used at supporting steel.

  • Does the visual quality and placement of the arc spot welds comply with the contract drawings and AWS D1.3 (2018), Section 8.1.1?

  • Describe the arc spot weld deficiency(ies).

  • Required Weld Pattern/Spacing

  • Please specify the required weld pattern/spacing.

  • Installed Weld Pattern/Spacing

  • Please specify the installed weld pattern/spacing.

  • Type of Mechanical Fasteners

  • Hilti Fastener Type

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Describe the type of Hilti fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Type of Simpson Strong-Tie Fastener.

  • Describe the type of Simpson Strong-Tie Fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Specify type of mechanical fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Description of the connection type(s)

  • Does the installation of the connection(s) comply with the contract drawings, manufacturer's recommendations, applicable code section?

  • Description of the deficiency.

  • Location(s)/Grid Lines of the deficiency(ies).

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Do the installed conditions comply with the contract drawings, AWS D1.1, AISC, and ACI requirements?

  • Please specify the type of deficiency(ies).

  • Please specify type of deficiency(ies).

  • Location(s)/Grid Lines of deficiency(ies).

  • Accept/Reject

  • Any other Item(s)/Area(s) inspected?

Inspection Item 8

  • Inspection Type

  • Type of Bolt(s)

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Comments/Description

  • Picture(s)

  • Do the bolt assemblies comply with RCSC requirements?

  • Description of deficiency(ies)

  • Specify grade of bolts installed.

  • Please specify

  • Specify grade of installed nuts

  • Specify grade of installed washers.

  • Location(s)/Grid Lines of deficiency(ies)

  • Do the bolt assemblies comply with project requirements?

  • Description of deficiency(ies)

  • Please specify

  • Location(s)/Grid Lines of deficiency(ies)

  • Required bolt tensioning method.

  • Method of pretensioning used

  • Have the twist-off splines been correctly severed?

  • Have the bolt assemblies been properly match-marked and turned per RCSC Table 8.2?

  • Have the bolt assemblies been properly tensioned per RCSC Table 8.1?

  • Is the appropriate feeler gage refused entry in at least half of the spaces between the protrusions?

  • Are the DTI protrusions facing away from the connecting plies?

  • (Snug-Tight) Have the plies of the connected elements been brought into firm contact as described in RCSC?

  • (Snug-Tight) Have the bolt assemblies been tightened sufficiently to prevent the turning of the nuts without use of a wrench?

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Specify Bolt Inspection Type

  • Comments/Description

  • Picture(s)

  • Accept/Reject

  • Location(s)/Grid Lines of deficiency(ies).

  • Location(s)/Grid Lines of deficiency(ies).

  • Weld Category

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Type of fasteners used at supporting steel.

  • Does the visual quality and placement of the arc spot welds comply with the contract drawings and AWS D1.3 (2018), Section 8.1.1?

  • Describe the arc spot weld deficiency(ies).

  • Required Weld Pattern/Spacing

  • Please specify the required weld pattern/spacing.

  • Installed Weld Pattern/Spacing

  • Please specify the installed weld pattern/spacing.

  • Type of Mechanical Fasteners

  • Hilti Fastener Type

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Describe the type of Hilti fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Type of Simpson Strong-Tie Fastener.

  • Describe the type of Simpson Strong-Tie Fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Specify type of mechanical fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Description of the connection type(s)

  • Does the installation of the connection(s) comply with the contract drawings, manufacturer's recommendations, applicable code section?

  • Description of the deficiency.

  • Location(s)/Grid Lines of the deficiency(ies).

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Do the installed conditions comply with the contract drawings, AWS D1.1, AISC, and ACI requirements?

  • Please specify the type of deficiency(ies).

  • Please specify type of deficiency(ies).

  • Location(s)/Grid Lines of deficiency(ies).

  • Accept/Reject

  • Any other Item(s)/Area(s) inspected?

Inspection Item 9

  • Inspection Type

  • Type of Bolt(s)

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Comments/Description

  • Picture(s)

  • Do the bolt assemblies comply with RCSC requirements?

  • Description of deficiency(ies)

  • Specify grade of bolts installed.

  • Please specify

  • Specify grade of installed nuts

  • Specify grade of installed washers.

  • Location(s)/Grid Lines of deficiency(ies)

  • Do the bolt assemblies comply with project requirements?

  • Description of deficiency(ies)

  • Please specify

  • Location(s)/Grid Lines of deficiency(ies)

  • Required bolt tensioning method.

  • Method of pretensioning used

  • Have the twist-off splines been correctly severed?

  • Have the bolt assemblies been properly match-marked and turned per RCSC Table 8.2?

  • Have the bolt assemblies been properly tensioned per RCSC Table 8.1?

  • Is the appropriate feeler gage refused entry in at least half of the spaces between the protrusions?

  • Are the DTI protrusions facing away from the connecting plies?

  • (Snug-Tight) Have the plies of the connected elements been brought into firm contact as described in RCSC?

  • (Snug-Tight) Have the bolt assemblies been tightened sufficiently to prevent the turning of the nuts without use of a wrench?

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Specify Bolt Inspection Type

  • Comments/Description

  • Picture(s)

  • Accept/Reject

  • Location(s)/Grid Lines of deficiency(ies).

  • Location(s)/Grid Lines of deficiency(ies).

  • Weld Category

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Type of fasteners used at supporting steel.

  • Does the visual quality and placement of the arc spot welds comply with the contract drawings and AWS D1.3 (2018), Section 8.1.1?

  • Describe the arc spot weld deficiency(ies).

  • Required Weld Pattern/Spacing

  • Please specify the required weld pattern/spacing.

  • Installed Weld Pattern/Spacing

  • Please specify the installed weld pattern/spacing.

  • Type of Mechanical Fasteners

  • Hilti Fastener Type

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Describe the type of Hilti fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Type of Simpson Strong-Tie Fastener.

  • Describe the type of Simpson Strong-Tie Fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Specify type of mechanical fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Description of the connection type(s)

  • Does the installation of the connection(s) comply with the contract drawings, manufacturer's recommendations, applicable code section?

  • Description of the deficiency.

  • Location(s)/Grid Lines of the deficiency(ies).

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Do the installed conditions comply with the contract drawings, AWS D1.1, AISC, and ACI requirements?

  • Please specify the type of deficiency(ies).

  • Please specify type of deficiency(ies).

  • Location(s)/Grid Lines of deficiency(ies).

  • Accept/Reject

  • Any other Item(s)/Area(s) inspected?

Inspection Item 10

  • Inspection Type

  • Type of Bolt(s)

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Comments/Description

  • Picture(s)

  • Do the bolt assemblies comply with RCSC requirements?

  • Description of deficiency(ies)

  • Specify grade of bolts installed.

  • Please specify

  • Specify grade of installed nuts

  • Specify grade of installed washers.

  • Location(s)/Grid Lines of deficiency(ies)

  • Do the bolt assemblies comply with project requirements?

  • Description of deficiency(ies)

  • Please specify

  • Location(s)/Grid Lines of deficiency(ies)

  • Required bolt tensioning method.

  • Method of pretensioning used

  • Have the twist-off splines been correctly severed?

  • Have the bolt assemblies been properly match-marked and turned per RCSC Table 8.2?

  • Have the bolt assemblies been properly tensioned per RCSC Table 8.1?

  • Is the appropriate feeler gage refused entry in at least half of the spaces between the protrusions?

  • Are the DTI protrusions facing away from the connecting plies?

  • (Snug-Tight) Have the plies of the connected elements been brought into firm contact as described in RCSC?

  • (Snug-Tight) Have the bolt assemblies been tightened sufficiently to prevent the turning of the nuts without use of a wrench?

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Specify Bolt Inspection Type

  • Comments/Description

  • Picture(s)

  • Accept/Reject

  • Location(s)/Grid Lines of deficiency(ies).

  • Location(s)/Grid Lines of deficiency(ies).

  • Weld Category

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Does the visual quality of the welds comply with the specified details, contract drawings, and AWS D1.1 (2020), Table 8.1?

  • Describe the weld deficiencies (Select all that apply).

  • Please specify.

  • Location(s)/Grid Lines of deficiency(ies)

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Type of fasteners used at supporting steel.

  • Does the visual quality and placement of the arc spot welds comply with the contract drawings and AWS D1.3 (2018), Section 8.1.1?

  • Describe the arc spot weld deficiency(ies).

  • Required Weld Pattern/Spacing

  • Please specify the required weld pattern/spacing.

  • Installed Weld Pattern/Spacing

  • Please specify the installed weld pattern/spacing.

  • Type of Mechanical Fasteners

  • Hilti Fastener Type

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Describe the type of Hilti fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid lines of deficiency(ies).

  • Type of Simpson Strong-Tie Fastener.

  • Describe the type of Simpson Strong-Tie Fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Specify type of mechanical fastener.

  • Are the fasteners at supporting steel installed correctly per the contract drawings, manufacturer's recommendations, and SDI requirements?

  • Describe the deficiency(ies).

  • Describe the deficiency(ies)

  • Location(s)/Grid Lines of deficiencies (approximate).

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Description of the connection type(s)

  • Does the installation of the connection(s) comply with the contract drawings, manufacturer's recommendations, applicable code section?

  • Description of the deficiency.

  • Location(s)/Grid Lines of the deficiency(ies).

  • Accept/Reject

  • Area/Building/Section

  • Floor Level and/or Elevation

  • Grid Lines Inspected

  • Referenced Details (if available)

  • Comments/Description

  • Picture(s)

  • Do the installed conditions comply with the contract drawings, AWS D1.1, AISC, and ACI requirements?

  • Please specify the type of deficiency(ies).

  • Please specify type of deficiency(ies).

  • Location(s)/Grid Lines of deficiency(ies).

  • Accept/Reject

  • Any other Item(s)/Area(s) inspected?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.