Inlet Works / Storm Treatment
-
Flow
-
Are there any signs of blockages from rag or grit?
-
Screens
-
Are the screens working effectively?
-
Crude Sewage Sample Point
-
At the agreed location and clearly labelled?
-
Is sample representative?
-
Storm Tanks
-
All available, drained and clean?
-
Return automatically or manually. Is it working correctly and are all assets available?
-
Storm Screening
-
Available and effective to meet permit?
-
Storm Sampling Point
-
At the agreed location and clearly labelled?
-
Storm Handling
-
Are there any abandoned assets on site that are a permit requirement?
Primary Treatment
-
PSTs
-
Is there evidence of significant solids carry over?
-
Tanks in good working order? <br>Scum Boards in place ? No structural issues and sludge scrapers appear to be working?
Secondary Treatment
-
Distributors
-
Distributors working effectively?
-
Significant vegetation growth on beds?
-
Evidence of ponding on filters?
-
RBC / BAFF / SAF
-
Package plant appears to be operating correctly? <br>RBC rotating?<br>Blowers operational?
-
Aeration System
-
Dissolved oxygen readings indicate that the aeration system is operating satisfactorily?
-
Activated Sludge Process
-
Significant scum or foam on the surface of ASP/Ditch/FST?
-
Are MLSS and Golden Measure records available on site?
Final Settlement
-
Final Settlement / Humus Tanks
-
Is there evidence of excessive carry over of solids?
Tertiary Treatment
-
Tertiary Treatment Plant
-
Is there evidence of excessive carry over of solids from the tertiary process?
-
Disinfection and Dosing
-
Is this in accordance with Discharge Permit?
OSM / UWWTD Sampling
-
Final Effluent Sample Point
-
At the agreed location & clearly labelled?
-
Will representative sample be obtained?
-
Signs in place for 2 tier permit?
-
UWWTD
-
UWWTD auto samplers suitable and MCERTS certified?
Flow Measurement
-
Is the flow measurement device operating and is the read out visible?
-
Is flume or weir free from debris, organic growth, scum and grit both upstream and downstream?
-
Is the sensor head clean?
-
Is there a tranquil approach to the flow measurement device with minimal surface chevrons?
Pumping Stations
-
Is there standby pump facilities provided if required by the permit?
Other Equipment
-
Telemetry
-
Does the site have a telemetry system to indicate breakdown?
-
Power
-
Standby Generator available?
Environmental Impact Assessment
-
Storm Discharges
-
Is there sewage derived debris downstream of storm discharges?
-
Is there ‘sewage fungus' downstream of storm discharges?
-
Final Effluent Discharge
-
Is there ‘sewage fungus' downstream of the final effluent discharge?
-
Outfall
-
Are Headwalls in good condition?
-
Is access to Outfalls available?
-
Site Discharge Permit
-
Is a copy of the permit limits available on site? Do you know where to find the Permit?
-