Information

  • Document No.

  • Project Name

  • Project No.

  • Subcontractor

  • Conducted on

  • Prepared by

  • Location
  • Subcontractor Representative

  • This audit ensures the successful operation of the IMS (Integrated Management System) to comply with statutory and regulatory requirements in accordance with:

    🔶 AS/NZS ISO 9001
    🔶 AS/NZS ISO 14001
    🔶 OHSAS 18001
    🔶 AS/NZS 4801

SITE DOCUMENTATION

MSDS

  • Are MSDS's available for all Hazardous substances used on site by the Subcontractor?

  • Are hazardous substances stored in accordance with their MSDS?

  • Are all labels on substances clear and appropriate?

QSE Plan

  • Is there a copy of the subcontractor's project specific QSE Plan on site?

  • Has the Plan been signed by an authorized manager?

  • Has the company been inducted into the Structural Systems Project QSE plan and have their employees signed the responsibilities section of the plan?

SWMS

  • Are there high risk activities carried out on site by the subcontractor? i.e. requiring SWMS's.

  • Are SWMS's documented for all high risk tasks?

  • Select the Subcontractor details listed in SWMS

  • Check the approval evidenced on the SWMS

  • Do the SWMS nominate who is responsible for managing the implementation of the SWMS?

  • Are Hazards, Risks and Controls for the tasks clearly identified in the SWMS?

  • Do the SWMS include a record or sign off from the employees, indicating that they have read and understand the SWMS, and agree to work to them?

  • Are relevant Legislation, Standards & Codes of Practice listed in SWMS?

Site Inspections

  • Are subcontractors participating in site inspections?

  • Are subcontractors implementing actions from site inspections within the designated times?

Training

  • Do all subcontractor employees hold an Industry General Safety Induction Card?

  • Have all subcontractor employees undertaken a site specific induction?

  • Do subcontractor employees hold the appropriate certificate of competency or High Risk Licence for the task being undertaken?

  • Are subcontractor employees participating in Prestart Meetings and Toolbox Talks?

SITE OBSERVATIONS

PPE

  • Check the compulsory PPE being worn by subcontractor employees

  • When using hazardous substances, is PPE being worn according to the MSDS?

  • Is hearing protection worn in high ones areas?

Plant & Machinery

  • Does plant have a current certificate of inspection?

  • Has a Prestart Inspection Log been completed for plant?

  • Do employees operating plant hold a High Risk Licence and is it current?

Tools & Equipment

  • Does all electrical equipment carry a current test tag?<br>

  • On electrical equipment, are all plugs and leads in good condition?<br>

  • Are all power leads suspended from the ground by insulated hooks or stands?<br>

  • Is guarding in place on equipment and not tampered with?

Work Area

  • Is there clear access to work areas?

  • Is the work area clean & tidy and free from trip hazards?

  • Is lighting appropriate for the task being undertaken?

Work @ Height

  • Is fall protection in place and adequate?

  • Are penetrations in the work area covered?

  • Is scaffolding required?

  • Is scaffolding erected on a solid base with no visible signs of damage?

  • Has scaffolding been erected by trained personnel?

  • Are handrails and kick boards in place?

Sign off

  • AUDITOR

  • SUBCONTRACTOR

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.