Title Page

  • Site name

  • Inspection Type

  • Conducted on

  • Prepared by

  • Plot number

Super structure - Joist

  • DPMs correctly installed to any opening/bridge - 150mm either side of lintel and 75mm upstand either end

  • All trays and cavities to be completely clean with no rips

  • Has tray been checked from feeling inside meter box opening

  • Has tray been checked from feeling inside meter box opening

  • Weep vents installed maximum 450mm centres

  • Ties installed correctly - maximum 900mm centres, clean, not falling internally, 50mm embedment

  • Ties at corners & reveals - maximum 225mm vertical spacing, 150mm horizontal from corner or reveal

  • All beds and perps full of mortar

  • All frogs filled

  • Lintels fully bedded and correct bearing - 100mm up to 1200mm, 150mm over 1200mm

  • Window clips installed correctly at each course of blockwork

  • Check correct storey height to drawing

  • Cavities to be consistently 100mm wide

  • Brickwork plumb - top courses of lift not leaning

  • All correct size formers installed, with clips to every course

  • Fire stopping correctly installed to all party walls - compression fitted, no gaps

  • All blockwork is solid - no loose areas

  • Expansion joints correct to drawing with ties either side within 150mm and every block course

  • Party wall insulated and clear of any debris

  • Perimiter of flooring to be completely glued

  • Joists installed as per drawing

  • Are joist packers used - must be non compressible

  • All nail heads to be glued

  • Joist blocking pieces all fitted, both sides of joist

  • Joist hangers fully nailed

  • Restraint straps fitted correctly - 100mm to allow masonry leaf

  • Flooring installed with plenty of visible glue to top and bottom of flooring

  • Ensure flooring is level

  • Flooring protected from the elements completely - joints to be taped if plastic covering is loose

  • Scaffold and plot left clean and tidy

  • Bay window stones installed

Super at Roof

  • Wall plate fully bedded

  • Trusses installed to manufacturers detail including bracings

  • Framing bracing and restraint straps installed at maximum 2m centres

  • Facia and soffit installed correctly - with corners and joint strips

  • Truss hangers fully nailed and correctly installed

  • Spandrel panel free from damage - fire stopping underneath to blockwork

  • Fire stopping correct to ARC detail - Eaves closed, Party wall closed, Under and over spandrel

  • If Internal core holes out - fully pointed perps

undefined

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.