Title Page

  • Site Address:
  • Supervisor:

  • Date:

  • Job No:

Untitled Page

  • Review each item, mark on slab or frame and action with appropriate subcontractor or supplier
    ✔ = inspected and correct
    ✘ = incorrect require action to rectify

Site establishment

  • Builder sign in place & visible?

  • Is the silt fence & d’way gravel in place? pedestrian paths clean and clear

  • Are all temp downpipes installed & connected?

  • Skip Bin

Frame Check

  • Are framed walls / Posts plumb?

  • Are all nails & nogs flush with wall face?

  • Are cornice lines level, flush & packed where req?

  • Are bulkheads & recesses installed correct size & fixed correctly?

  • Check for all wall nog locations- toilet, towel, TV etc

  • Bath type & frame size

  • Garage door track and motor blocks installed

  • Square set openings – Square and plumb

Window & Door Installation

  • Windows & doors installed plumb/flush , packed & fixed?

  • Is the wall wrap returned inside of frame?

  • Are recessed doors packed 450mm max ctr, level & plumb?

  • Set alfresco door height for floor coverings

  • Cavity Door frame 4mm packer under frame

Slab Markout

  • Floor coverings to each room- type & size

  • Door hang direction

  • Entry lock type

  • AC return vent location / Split System wall unit location

  • Shelving type in Robes, Linen & other cupboards

  • Wall batt locations & type in internal & ext walls

  • Plasterboard ceiling control joint location

  • Mark bath type, opening size & check frame size

  • Mark external articulation joints on slab rebate/wall wrap

Services

  • Is the earth bar exposed & connected within frame

  • Are all electrical /gas conduits within wall frame where possible and no more than 25mm outside frame

  • Is the I.O. located in driveway & protected

  • Floor waste type, Smart waste, strip grate,std waste

  • Are all wastes pipes in correct locations?

  • Are all plumbing pipes fixed & checked for leaks by plumbers?

  • Is the vent pipe plumb, & extended into ceiling with backet fixed to truss?

  • Ensure studs not notched

  • Check fridge water, Alfresco gas Bayonet

  • Check inwall services, Vacuum / Security / home theatre wiring provisions if applicable

  • TV antenna installed

Tiles / Joinery / Bench tops

  • Wall tiling, Mark full height, std height, square set in locations

  • Joinery type – Standard / 2 Pac

  • Bench tops – 40mm / 20mm / Polymarble top

External

  • External construction join Marked on rebate

  • Engaged pier cladding type, distance to window etc

  • Cladding / Brickwork / AAC areas marked

  • Zero Boundary wall Flashing installed- refer process/photo

  • Check gutter fall & drops line up to correct location

  • Mark external control joints on slab edge & wrap

  • Is the wall wrap installed with correct overlap & without tears/holes

  • Frame inspection Booking date?

  • Frame Passed?

  • Notes

Sign-off

  • Prepared by

  • Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.