Information
-
Client / Site
-
Conducted on:
-
Prepared by:
-
Project number:
-
Project start date:
-
Project completion date:
-
Run number:
-
Quantity of cabinets fitted:
Run Handover
-
Is the exterior of the vehicle clean?
-
Is the drive cab clean and tidy?
-
Is the rear area of the van tidy?
-
Is the lifting bar in the van, is it in good working order?
-
Are there 4 x spiders, and are they in good working order?
-
Are there bogeys in the vehicle, are they in good working order?
-
Are all electric tools and chargers PAC tested?
-
Are there any company tools in vehicle, list.
-
Are all system dividers fitted (where required and without damage)?
-
Are all product dividers fitted (where required and without damage)?
-
Are milk chutes fitted and secure with back plinths fitted (where MRIMs installed)?
-
Are all lights operating correctly and aligned (where required)?
-
Are mouse hole covers fitted (where required)?
-
Is rear cladding fitted (where required)?
-
Are pipe upstands fitted and correctly secured (where required)?
-
Night blinds fitted and working correctly?
-
Doors tensioned (where fitted)?
-
Are all cabinets clean and tidy?
-
Can the run be merchandised?
Sign Off
-
Inspected and signed on behalf of George Barker Refrigeration (Leeds) Ltd.
-
Received and signed by:
-
On behalf of: