Title Page
-
Ticket Of Work:
- NBN
- Telstra
- Optus
- TPG
- Telstra & NBN
Scope of Works (This section should provide a clear understanding of work that is required to allow an accurate design, price, and method of works to be created for the end Customer.)
-
Provide a detailed description of the required project Scope
-
Ticket Of Work Address
-
Site details:
-
Site Contact Name:
-
Site Contact Phone Number:
-
Site Contact Email:
-
Survey Date:
-
Field Represenative:
-
Location
-
Special Conditions. ( inductions, Permits, Police Checks, out of hours)
- Working with Childrens / Police Check
- Site Inductions
- Out of Hours requested
- Heritage/ Cultural / Fauna reserve / waterways
- Additional CounciL / Shire Consultatiin
- Developers input ( heights / Clearances etc)
Works Required
-
Works required based on scope provided (Construction Plan)
Loc Reference
-
Loc Id
-
Provide a detail of required works referencing relevant Locations ( Loc A to Loc C) Include any asset reference Id
-
Method of Civils
- Open Trench
- Directional Drill
- Non Destructive Digger ( Fauna)
- NDD ( Services)
- Asbestos Management required
-
Identified cables in Loc location ( photos of cable identification required)
- Fibre NBN
- Fibre Telstra
- Fibre Other
- Copper
- HFC Network (Cx50, CX75) UG
- HFC Network ( cx50 , cx75) aerial
- Direct buried Copper
- Unidentified Cable ( known in this location)
- HFC (RG6, RG11)
- NA
- Cable Joints
-
Asbestos Works Required
-
Break Out & Reinstatement
-
Quantity
-
Location Call outs
- Hospital/ Medical centre
- Schools
- Age care facility
- Transport (Bus/trams/train)
- Utilities (Gas, Water, Power (UG/OH)
- Emergency Services
-
Location Photos
-
Are you installing pipe?
-
Between Loc IDs (Size of Pipe and Distance)
Haul
-
Joint Location
-
Provide a detail of required works referencing relevant Locations ( Loc A to Loc C ( all cables to be identified and photos provided)
-
cable plans or supporting info (Atlas, GDD, nearmaps)
-
Provide Photos for all Device locations (with LOC IDs)
-
Provide a description of the asset and required scope to remove or decommission
Aerial Works
-
Joint Location
-
Provide a description of required works referencing relevant Locations ( network, road crossing, EU drop cable) remember to capture all impacted cables
-
Provide Photos for proposed Aerial activities including Customers lead in cables if required
-
cable plans or supporting info (Atlas, ADR, near Maps)
-
Is EWP Required?
Project Summary - Provide a detail understanding
-
Recommended Contractor/s
-
Traffic Management
-
How long is Traffic required ( hours or Days)
- 1 Day
- 2 Days
- 3 Days
- 4 Days
- 5 Days
- Consultation with Civil Contractor required ( long duration)
- Night works required
- Half Day Only
-
Night works required
-
Permits (
-
What permits are required
-
Are Inductions or specific conditions required
-
Detail of requirements
Additional Information
-
Provide any relevant information that will assist with the submission of this survey or design query.
-
Date of Submission
-
Field Representative