Title Page

  • Conducted on

  • Prepared by

  • Location

Site Info

  • Initial budget

  • Date of original fit out?

  • Type of building?

  • Is this an organic or acquisition site?

  • Know acoustic issues?

  • Please add details

  • What level is the club on?

  • Please add detail

  • Asbestos on site (if pre 2000)?

  • Asbestos survey available?

  • M&E survey completed?

  • Have this been instructed?

  • Any lift issues?

  • Add details

  • Any water fountains to replace/install?

  • Add details

Scheme

  • Must have…

  • Nice to have…

External

  • Any works to signage?

  • Any works to external lighting?

  • Any works to car park or surround area?

  • AOB?

Entrance lobby

  • Any works to lighting?

  • Replace any flooring?

  • Upgrade kiosks?

  • Additional pods to be installed?

  • AOB

Main Gym Floor

  • Decoration and signage uplift?

  • Any works to TV/ boomerang screens

  • Replacing flooring?

  • Any works to the lighting?

  • Replacing night lockers?

  • Are we adding a managers podium

  • Are we adding a breakfast bar?

  • Are we installing ancillary products?

  • Any works to the vending area?

  • AOB?

Flex Area

  • Picture of current area

  • Addional mirrors required?

  • Installing new flooring?

Functional Area

  • Does this site currently have a FTz area?

  • Are we looking to upgrade and/or relocate

  • Are we looking to install and FTz area?

  • AOB

Free Weights Area

  • Are we proposing to extend area?

  • Any works to be carried out to the flooring?

  • Any acoustic issues in this area?

  • addional mirrors required?

  • AOB?

Main GEX Studio

  • Upgrade to current spec?

  • Any works to be carried out to extend/reduce size of studio?

  • Any works to the floor required?

  • Additional mirrors required?

  • If windows in area, any works to be carried out (ie frosting)

  • Any works to be carried out to the sound system?

  • AOB?

Cycle Studio

  • Upgrade to current spec?

  • Any works to be carried out to extend/reduce size of studio?

  • Any works to lighting?

  • Any works to flooring?

  • If windows in area, any works to be carried out (ie frosting)

  • Any works to be carried out to the sound system?

  • AOB?

Female Changing Rooms

  • Are we looking to reclaim gym floor space?

  • Any HVAC issues?

  • Replacing shower block?

  • Replacing toilet block?

  • Replacing lockers?

  • Any works to flooring

  • Any works to lighting?

  • Any works to ceiling grid?

  • Upgrade/additional vanity units?

  • Install changing cubicles?

  • AOB?

Male Changing Rooms

  • Are we looking to reclaim gym floor space?

  • Any HVAC issues?

  • Replacing shower block?

  • Replacing toilet block?

  • Replacing lockers?

  • Any works to flooring

  • Any works to lighting?

  • Any works to ceiling grid?

  • Upgrade/additional vanity units?

  • Install changing cubicles?

  • AOB?

Accessible Toilet & Shower

  • Any HVAC issues?

  • Any works to flooring

  • Any works to lighting?

  • Any works to ceiling grid?

  • New Doc M pack or grab rails?

  • AOB

Office

  • Are we removing the office?

  • Replacing any office furniture?

  • Any works to flooring?<br>

  • Any works to lighting?

  • AOB

Break Out Room

  • Are we planning to reallocate or split break out room and locker room?

  • Replacing any appliances?

  • Any works to flooring?<br>

  • Any works to lighting?

  • Installing a breakfast bar?

  • AOB?

Assessment Room

  • Are we removing or relocating the assessment room?

  • Any works to flooring?<br>

  • Any works to lighting?

  • AOB?

Other BOH Areas

  • Marketing room action?

  • Vend/stockroom action?

  • Cleaners cupboard action?

  • AOB?

Equipment

  • CV notes

  • FP notes

  • Flex notes

  • FTz notes

  • FW notes

  • Studio notes

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.