  • Wibaux Anderson Hot Plant Site MT NOI Number MTR105569 Primary SWPPP Administrator: Tim Barth Secondary SWPPP Administrator: Aaron Golik

  • Theodore National Park ND NOI Number NDR Primary SWPPP Administrator: Tim Barth Secondary SWPPP Administrator: David Drga

  • Axness Farms Pit ND NOI Number NDR32-0000 Primary SWPPP Administrator: Garrett Workman

  • Century Sidney Facility MT NOI Number MTR105530 Primary SWPPP Administrator: Tim Barth Secondary SWPPP Administrator: Garrett Workman

  • New Bighorn County AIrport - Phase II MT NOI Number MTR105006 Primary SWPPP Administrator: Tim Barth Secondary SWPPP Administrator: Tyler Hulbert

  • Lower Two Calf Road Reroute Upper Missouri River Breaks, Bureau of. Land Management MT NOI MTR105688 Primary SWPPP Administrator: Tim Barth Secondary SWPPP Administrator: Carl Patton

  • Site Name

  • Conducted on

  • Prepared by

  • Personnel

Opening

General Information

  • Type of inspection?

  • Date of previous inspection

  • Weather Conditions

  • Temperature

  • Sky Conditions

  • Ground Conditions

  • Has it Rained since the last inspection?

  • Date of Storm Event:

  • Amount of Precipitation:

  • Storm water runoff occurring?

  • Location(s) and description- of discharges of sediment or other potential pollutants from the site:

Site Assessment

  • Present phase of construction?

  • Are there any discharges that have occurred since the last inspection?

  • Was discharge in compliance?

  • Describe the non-compliant discharge

  • Description of corrective action taken for items identified, date for the corrective action(s) taken for each, measures taken to prevent future recurrences.

  • Has the non-compliant been reported?

  • Have changes to the SWPPP been made to reflect the measures taken?

  • Site perimeter contained?

  • Disturbed areas contained?

  • Estimated disturbed area at time of inspection (acres):

  • Are dust control measures being used as needed?

  • Material storage areas contained?

  • Material stockpiles contained?

  • Vehicle/equipment areas contained?

  • Is a spill containment kit on site?

  • Have there been any spills, leaks or hose breaks that have occurred since the last inspection?

  • Spill
  • Location

  • Size (gallons)

  • Was it reportable?

  • Was it reported?

  • Debris containers available

  • Offsite tracking minimized?

  • Identify potential pollutants present

  • Potential Pollutants

  • Pollutant
  • Pollutant

  • Properly contained/contingency

  • Have all erosion and sediment controls and BMP's identified in the plan been installed or implemented?

  • Explanation
  • Reason for discrepancy

Site Debri

  • Are all construction materials kept within the project limits?

  • Location
  • Materials not kept within project limits

  • Anticipated date of addressing issue

BMP Inspection

  • Is there evidence of sediment depositing off-site other than in surface waters, drainage ditches and stormwater conveyance systems?

  • Sediment must be recovered in a manner and frequency sufficient to minimize off-site impacts – for example, sediment could wash away during the next precipitation event. Date to be repaired/Stabilized.

  • Is stormwater flow distributed evenly over vegetative buffers?

  • If vegetative buffers are silted covered, contain rills or are otherwise rendered ineffective, other erosion and sediment controls must be implemented. Eroded areas must be repaired and stabilized. Date to be repaired/Stabilized.

  • Is sediment accumulating in vegetative buffers?

  • If vegetative buffers are silted covered, contain rills or are otherwise rendered ineffective, other erosion and sediment controls must be implemented. Eroded areas must be repaired and stabilized. Date to be repaired/Stabilized.

  • Are rills forming within vegetative buffers?

  • If vegetative buffers are silted covered, contain rills or are otherwise rendered ineffective, other erosion and sediment controls must be implemented. Eroded areas must be repaired and stabilized. Date to be repaired/Stabilized.

  • Are Erosion and sediment controls operating consistently and effectively?

  • Location
  • Description

  • Are there any devices similar to silt fence or fiber rolls where sediment has reached more than 1/3 the height of the device?

  • Area
  • Description

  • Date to be fixed by; Removal and repairs must be made within 24 hours

  • Are there any sediment basins where collected sediment has reduced the storage capacity by 1/2?

  • Area
  • Description

  • Date to be fixed by; Removal and stabilization must be completed within 7 days unless prohibited by legal, regulatory or physical access constrains. All reasonable efforts must be made to obtain access. Once permission is granted, removal must take place within 7 days

  • Are there additional BMPs are needed that were not in place at the time of inspection

  • Area
  • Location and description:

  • Description of corrective action taken for items identified and measures taken to prevent future recurrences.

  • Date for the corrective action to be taken

Inlet Protection

  • Are inlets that are or will be functional during construction protected?

  • Location
  • Inlet that needs to be protected

  • Anticipated date of addressing issues

  • Are inlet protections being maintained?

  • Location
  • Inlet that needs to be maintained

  • Anticipated date of addressing issues

  • Are inlets that are or will be functional during construction protected?

  • Location
  • Inlet that needs to be protected

  • Anticipated date of addressing issues

Concrete Waste

  • Are there concrete activities present?

  • Are washouts adequate for the amount of material being discharged?

  • Are liners free from tips and tears?

  • Are washouts located in a location that will not effect water inlets?

Closing

  • Has the SWPPP Plan been updated as a result of this inspection?

  • Has the Site Map been updated as a result of this inspection?

  • I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information; including the possibility of fine and imprisonment for knowing violations.

  • Inspector

  • SWPPP Administrator

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.