Information
-
Document No.
-
Audit Title
-
Location
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Safe Work Procedures
-
SWP - Blower - Petrol operated
-
SWP - Chainsaw operation
-
SWP - Recovery strap
-
SWP - Agivator Tractor Operator
-
SWP - Angle Grinder
-
SWP - Auger - Petrol Operated
-
SWP - Brush - Cutter petrol operated
-
SWP - Cordless Drill
-
SWP - Drive and Manoeuvre Trailers
-
SWP - edger
-
SWP - Electric drill
-
SWP - Flail Deck Mower (Tractor mounted)
-
SWP - Hedge Trimmer
-
SWP - Mig Welder
-
SWP - Mowing Deck (wings) Tractor Mounted
-
SWP - Push Mower
-
SWP - Push Mower
-
SWP -Ride on Mower
-
SWP - Spray Unit Tractor Mounted
-
SWP - Tractor
-
SWP - Collection of Water Samples
-
SWP - Compound Mitre Saw
-
SWP - Fuel Handling
-
SWP - Garden Bed Maintenance
-
SWP - Garden Bed Mulching
-
SWP - Garden Bed Planting
-
SWP - Parkland land grass Verge Mowing
-
SWP - picking up sharps
-
SWP - Working Near Water bodies
Work Method Statements
-
WMS - Fuel handling
-
WMS - Implementation of Traffic Control
-
WMS - Loading and Unloading Plant Trailer
-
WMS - Loading and Unloading Trucks and Utilities
-
WMS - Pesticide Application In Parklands (small volume)
-
WMS - Pesticide Application in Parklands and Sportsfields (Large Volume)
-
WMS - Playground and Infrastructure Inspection and Minor Repairs
-
WMS -Playground Mulch Repair and Replacement
-
WMS - Roadside Mowing
-
WMS - Sports field Mowing
-
WMS - Truck Driving
-
WMS - Changing Implements on Plant
-
WMS - chainsaw operation
-
WMS - Polesaw Operator
-
WMS - Collection of water samples
-
WMS - Garden Bed Maintenance
-
WMS - Garden bed Mulching
-
WMS - Garden Bed Mulching
-
WMS -Chemical Handling (Pesticide)
-
WMS - Garden Bed Planting
-
WMS - Refueling at Depot
-
WMS - Parklands and Grass Verge Mowing
-
WMS - Mowing Activities During Fire Danger Periods
-
WMS - Working near water bodies
Hazard / Condition
-
Site access / agrees poor
-
Signs / lamp posts
-
Scaffold secure
-
Overhead power lines
-
Other electrical hazards
-
Underground services
-
Exposed Reo
-
Environment (ie noise, dust, fumes)
-
Others working above / below
-
Falling objects possible.
-
Warning notices required.
-
No go zones in area.
-
Exclusion zone not set up
-
Pits / trenches
-
Ground and support conditions poor.
-
Not consulted with other work groups in area.
-
Demolition work nearby.
-
Working on / in / near water
-
Inadequate traffic / pedestrian control
Other - anything that is not listed above.
Personal Protective Equipment
-
Breathing equipement
-
Eye protection
-
Hearing protection
-
Gloves
-
High vis
-
Hard hat
-
Harness
-
Long long
-
Face shield
-
Protective boots
-
Sun hat