Title Page
-
30 Grosvenor Square
-
Conducted on
-
Conducted by
-
Location
Inspection
-
Area clean, dry and ready for works
-
Datums are set out and clearly marked
-
Floor level is correct
-
Walls square and plumbed and dims are correct
-
Ceiling Completed
-
Gully instaled in correct position and height
-
Are pipework and other services on the correct position?
-
Wall build/ Carcass above the vanity completed
-
Basins are in place ?
-
Bathtub installed ?
-
Other Comments and Make Ready Needs (MRNs) ?
-
Additional Comments and Photos
Status
-
Takeover Accepted ?
-
EDM Signature
-
MPX Signature
-
Mivan Signature