Information

  • Document No.

  • Task Risk Assessment

  • Client/customer

  • Job Address
  • Task / Activity

  • Add media

  • Conducted on

  • Prepared by:

  • Personnel on Site

  • Add signature

  • Required PPE to carry out the activity

  • Work Activity: Arrival on Site

    Hazards Present: Moving vehicles, people (staff and customers), access, falling objects, heavy lifting, slips,trips & falls, Hazardous substances, noise, biological factors

    Risk Control Measures: High-Vis clothing, appropriate PPE, appropriate parking, advise client & others of arrival on site, display identification,

  • Initial Risk (Between 1-25)

  • Residual Risk (between 1-25)

  • Work Activity: Use of Chemicals - paints, glues, solvents, adhesives, petrol, poisons

    Hazards Present: Hazardous substances, manual handling, slips/trips, exposure to inhalation, absorption and ingestion, spray drift

    Risk Control Measures: Handle according to manufacturers instructions (including label and SDS), appropriate PPE, wear moisture resistant boots with adequate grip, mix substances on level ground & away from others, replace lid on container, always use back flow prevention device

  • Initial Risk (Between 1-25)

  • Residual Risk (between 1-25)

  • Work Activity: Safe use of manual tools / saws, hammers, screwdrivers

    Hazards Present: Cuts, abrasions, splinters, eye damage due to flying debris

    Risk Control Measures: Concentrate on what is being done & don't get distracted, wear appropriate PPE, use tools as intended, keep tools in good working condition.

  • Initial Risk (between 1-25)

  • Residual Risk (between 1-25)

  • Work Activity: Working on or around sewer, drains & piping
    Note: SWMS Required for trenches greater than 1.5m deep

    Hazards Present: Cuts, hazardous substances, slip/trip/fall, contact with mobile plant, fall into open trenches

    Risk Control Measures: Wear appropriate PPE, use of disinfectant for hands, ensure trenches are filled & appropriately barricaded, plant operator aware of all people on site, provide SDS.

  • Initial Risk (between 1-25)

  • Residual Risk (between 1-25)

  • Work Activity: Work with Machine Excavator

    Hazards Present: Injury to site personnel, below ground services

    Risk Control Measures: Only licensed personnel to operate plant, daily machine checks/log book, plant operator aware of all site personnel, pedestrian detours in place (clearly defined and protected), buckets and blades lowered when not in use, services location (dial before you dig), overhead power lines.

  • Initial Risk (between 1-25)

  • Residual Risk (between 1-25)

  • Work Activity: Unloading of equipment

    Hazards Present: Fall from vehicle, traffic hazards, unfamiliar work site, electrocution

    Risk Control Measures: Wear appropriate PPE, unload vehicles in clear traffic areas, use of bollards and signage, conduct thorough site inspection, be aware of overhead power lines

  • Initial Risk (between 1-25)

  • Residual Risk (between 1-25)

  • Work Activity: Manual Handling Activities

    Hazards Present: Back strain, muscle strain, impact injuries

    Risk Control Measures: Warm up briefly, keep back straight, eyes fixed straight ahead, lift with legs and not back, use trolley or mechanical means if possible, use additional people if heavy load, wear appropriate PPE, don't twist

  • Initial Risk (between 1-25)

  • Residual Risk (between 1-25)

  • Work Activity: Safe use of ladders

    Hazards Present: Falls, sprains, breaks, back injury

    Risk Control Measures: Inspect ladder prior to each use (clean and undamaged), only use industrial rated ladder, two persons to carry if required, secure ladder to structure before use, have spotter to support ladder, use appropriate footwear, have 3 limbs on ladder at all times, never use hands to carry items on ladder, do not use ladder when broken, patched, oily or cracked rails, only one person to work on standard ladder.

  • Initial Risk (between 1-25)

  • Residual Risk (between 1-25)

  • Work Activity: Working Near Traffic

    Hazards Present: Impact with vehicles, slips, trips and falls

    Risk Control Measures: Wear high-vis vests, look before crossing roads/driveways/carparks etc, signs and traffic control in place before work commencing, wear appropriate PPE, be aware of warning devices, beepers and buzzers, don't work alone.

  • Initial Risk (between 1-25)

  • Residual Risk (between 1-25)

  • Work Activity: Working at Heights
    NOTE: SWMS required if working over 2m

    Hazards Present: Falls, falling objects

    Risk Control Measures:When working at heights over 2m, ensure appropriate fall protection is in place, develop SWMS prior to commencing work, locate power lines and stay 2m clear, identify other obstructions, ensure ladders placed on level surface, barcode area, isolate hazards & control risks.

  • Initial Risk (between 1-25)

  • Residual Risk (between 1-25)

  • Work Activity: Use of Scaffolding - Fixed & Portable

    Hazards Present: If over 4m, the person erecting the scaffold must hold appropriate certification, kkckboards and handrails must be installed & secured in place, all tools/equipment shall be removed when scaffold not in use, regular checking for faults, damage and stability, minimum clearance to electrical wires of 4m, mobile scaffolding wheel locks must be engaged when scaffold in use, no work to be performed on scaffold in wet weather, do not climb scaffold via standards or transoms, do not exceed manufacturers recommended weight loads.

  • Initial Risk (between 1-25)

  • Residual Risk (between 1-25)

  • Work Activity: Use of Power Tools

    Hazards Present: Electric shock, burns, excessive noise, cuts, abrasions, amputations, eye injuries

    Risk Control Measures: Equipment test/tag in place, visually check safety features and guards in place before use, don't operate in wet conditions, ensure earth leaking protection is in place and at the supply end of extension lead, if device trips do not restart until cause of issue is found, switch off tool if any faults or abnormal actions become apparent, wear appropriate PPE, and secure loose hair and clothing

  • Initial Risk (between 1-25)

  • Residual Risk (between 1-25)

  • Work Activity: Hot Work - Electric or Gas Welding/Soldering/Cutting

    Hazards Present: Burns, welding flash, fire, falling Roxy, acetylene, Roxy and acetylene flashback

    Risk Control Measures: Wear appropriate PPE, currently tagged, in date fire extinguisher must be available where hot work is to take place, do not use cylinders which are standing in an enclosed vehicle, is there is a possibility of a leak, test with soap and water, ensure no flammable liquids in the vicinity, bottles to be chained when in upright position, hoses to be fitted with flashback arresters and regulators, after use cylinder valves are tightly shut, outlet gas plugs and valve protection caps installed.

  • Initial Risk (between 1-25)

  • Residual Risk (between 1-25)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.