Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
There is an exclusion zone established that extends at least behind the working radius of the boom.
-
If required, outriggers are properly deployed and placed on suitable supports?
-
The daily inspection checklist has been completed prior to any work commencing.
-
There is an agreed communication method between the operator and the rigger/dogman?
-
There is a Safe Work Method Statement(SWMS) in place that identifies the hazards of the work?
-
If there is a risk of contact with overhead services it is identified and controlled in the SWMS?
-
Anyone attaching or removing lifting gear is suitably qualified (rigger/dogman)?