Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel inspecting
Previous Inspection
-
Has the last inspection been reviewed?
-
Any outstanding actions completed?
General Site Safety
-
Site security in place, fencing, barriers etc
-
Appropriate signage in place
-
Site visitor register in place and being used
-
Hazard board or register on site and updated
-
Date last updated
-
Photo if possible
Personal Protective Equipment
-
Head protection if hazards to workers head
-
Eye protection in use as required
-
Foot protection, safety footwear
-
Noise levels, site and neighbours
-
Hearing protection available and in use as required
-
Hand protection available and in use as required. Gloves etc
-
Skin protection. Sun, chemicals
-
Respiratory protection. dusts, chemicals
-
Clothing. Hi-viz, hats, chemicals, overalls etc
Platforms/Machinery
-
Guardrails, midrails, toe boards fitted
-
Fall protection in place
-
Load limits posted on lifting equipment (e.g. SWL)
-
Guards in place and in good condition
-
Noise and environmental controls in place
Scaffolding
-
Platforms full width (3 planks)
-
Wheels locked, braces fitted, ladders secure, guardrails, midrails, toe boards
-
Green scaffold OK tag in place
-
Date of last inspection (on back of OK tag)
-
Scaffold register in place, inspected weekly and completed for scaffolds above 5 metres
-
Certified scaffolding used for scaffolding over 5 metres
Excavations and Trenches
-
Geotech engineer's requirements complied with
-
Safe access and egress
-
Suitable batters, benching, shoring
-
Spoil and equipment more than 600mm from edge
-
Excavation or trench edge marking to prevent falls into excavation
-
Underground services identified and marked
-
Equipment at least 4 metres from overhead lines
-
Worksafe notified if trench deeper than 1.5 metres
-
Excavation not affecting stability of structures / roads
Confined Spaces
-
Entry Permit completed and robust
-
Emergency procedures in place
-
Tripod, lifting gear, harnesses OK and inspected
-
Atmosphere monitoring in place
-
Staff trained and current
-
Site controlled. Safe access and egress control
Temporary Traffic Management
-
TMP authorised by Council and held on site
-
Temporary speed restriction authorisation
-
Work area isolated from live lane, cone spacing and taper as per TMP
-
Signage position and mounting in accordance with TMP
-
Advance warning and end of work signage in place
-
STMS or TC on site
-
Public and pedestrian safety
Environmental
-
Silt fences and waterway protection in place and in good condition
-
Dust and noise disturbances controlled
-
Waste, slurry and dust collected and disposed of appropriately
-
Environmental controls comply with consent conditions
-
Spill kits in place and appropriate
Electrical Safety
-
Portable equipment tested and tagged
-
Plugs, sockets or switches have no damage
-
No frayed, pulled or damaged leads
-
Portable power tools in good condition with guards fitted
Chemical Safety
-
Hazardous substances register complete and available
-
Material Safety Data Sheets available for all chemicals
-
All containers labelled correctly
-
Unused substances disposed of appropriately
-
Workers trained in the use of hazardous substances
-
If required, is PPE available
-
Is adequate ventilation provided
-
Are eye washes and showers easily accessed and serviceable
Ladders
-
All ladders commercial grade
-
Ladders in good condition
-
Ladders secured top and bottom, extends at least 1 metre above landing
-
Positioned at an angle of 1 out to 4 up
Housekeeping
-
Site clean and tidy
-
Emergency procedures in place
-
Hand washing facilities on site
-
First aid equipment on site and up to date
-
Trained and current first aiders on site
-
Fire extinguishers in place and tested in the last 12 months
General Comments
-
Tap to enter information
-
Other site photos not recorded elsewhere
Sign Off
-
On-site representative
-
Signature