Title Page

  • To be completed bu the H&S Adviser or Nominated person prior to the start of construction work on site. Audit reports shall form part of the CDM Health & Safety file.

  • Sensible Monitoring Audit Completed By:

  • Site Manager:

  • Contract Number:

  • Project Title:

  • Conducted on

Appointments

  • Any H&S actions identified shall be entered onto Audit / Inspection Action Log and brought to the urgent attention of the appropriate personnel as soon as possible. Contractor / Project Manager to be notified of actions required / taken.

  • 1) What are the management arrangements for temporary works for the duration of the project?<br>(Procedures / Responsibilities / Design / Documentation etc.)

  • Comments:

  • Attach any images relevant to question 1 here.

  • 2) Has a Temporary Works Coordinator been formally appointed?

  • Comments:

  • Attach any images relevant to question 2 here.

  • 3) What minimum requirements have been established for the TWC's and TWS's?<br>(do the identify minimum requirements for competence experience, qualifications, knowledge & training)?

  • Comments:

  • Attach any images relevant to question 3 here.

Temp Works Schedule / Register

  • 4) Has a register of temporary works been established and is the register being maintained in accordance with the clients procedures?

  • Comments:

  • Attach any images relevant to question 4 here.

  • 5) Are all temporary works being undertaken on site (including temporary electrical supplies offices, workshop and equipment etc) identified on the Temporary Works Register?

  • Comments:

  • Attach any images relevant to question 5 here.

  • 6) Have all temporary works on the register been categorized to identify required level of controls?

  • Comments:

  • Attach any images relevant to question 6 here.

Design

  • 7) Has temporary works design been undertaken where specified on the register?

  • Comments:

  • Attach any images relevant to question 7 here.

  • 8) Has the TW design been reviewed by a 3rd party (where required) and approved by the TWC?

  • Comments:

  • Attach any images relevant to question 8 here.

  • 9) Do the RAMS for the works make reference to the TW design, plans and calculations (where applicable) to ensure correct implementation of the TW design?

  • Comments:

  • Attach any images relevant to question 9 here.

  • 10) Has a temporary works supervisor been nominated for each area of work?

  • Comments:

  • Attach any images relevant to question 10 here.

  • 11) Will regular temporary work inspections be undertaken as required by TWD / legislation and recorded?

  • Comments:

  • Attach any images relevant to question 11 here.

  • 12) Are the temporary works being installed in accordance with the TWD (where applicable) and is a copy available at the workface?

  • Comments:

  • Attach any images relevant to question 12 here.

  • 13) Is there a system in place for the review of temporary works for suitably following any change in condition i.e. excavations?

  • Comments:

  • Attach any images relevant to question 13 here.

  • 14) Is there an inspection system for the monitoring of temporary works to confirm compliance?

  • Comments:

  • Attach any images relevant to question 14 here.

Sign Off Audit

  • Print Name:

  • Signature:

  • Project Manager Name:

  • Signature:

  • Designation:

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.