Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Base build Handback
-
All Doors and windows are working fine?
-
All lights are working fine? Internal and External
-
All Services and drainages capped off properly?
undefined
-
-
All cleaning done?
-
FLS system inspected and Signed off by (SIBCA)?
-
All meter reading done?
-
All Fitout items removed?
-
Any Damages to the structure internally?
-
All Signages in place?
-
Base Build Alteration have drawings, Consultant approval and O&M documents?
-
FLS system alterations have DCD approval?
-
Training to FM for new installed systems?
-
Kitchen Ecoligy Unit cleaned?
-
Fire stopping reinstated?
-
Full inspection for all the drainage system? (not blocked by waste)
-
External condition of the building?
-
Planted areas condition?
-
Common areas surrounding the building are clean?
-
MEP system are fully functioning? (AC, switches, sockets.. Etc)
City Controls items
-
Violations closed?
-
All Permits closed?
-
All keys returned and verified?
Outstanding SRs on location and others
-
Any list of Outstanding SRs on the space?
-
Any additional points not listed in the previous pages?
Signature
-
ECD representative
-
FM representative
-
Tenant representative