Information
-
Store No & Name
-
Conducted on
-
Prepared by
-
Client
-
Personnel Present
-
Tesco Rep in Attendance
-
Install Date & time
Store Specific
Store Details
-
Store Address
-
Store Phone Number
-
Opening hours
-
Store Type
-
Permit to Work Location
-
Signing in Location
-
Asbestos Registrar Location
-
Car Registration System
-
Vehicle Unloading Location
-
Delivery Noise Restrictions
-
Working Noise Restrictions
-
General Works Access
Manager
-
Name
-
Telephone Number
-
Email Address
SDM
-
Name
-
Telephone Number
-
Email Address
Main Contractor
-
Company
-
Contracts Manager
-
Telephone Number
-
Email Address
SSCs
-
SSC Version
-
SSC Amount Size & Handing
-
SSC Numbering
-
SSCs
-
If V4 Is Scale Bed Front Type 1 or Type 2
-
Power & Data Supply Route
-
Are Any Panic/Call Buttons Present
-
Basket Shelves, Fixed Securely & Free From Damage
-
Basket Shelves
-
All Trim Screws & Spacers present
-
Screws & Spacers
-
All Panels & Screws Present
-
Access Panels (2xScrews in Each)
-
Missing Panels & Screws
-
Bagging Area All Screws Present
-
Bagging Area Screws
-
All Skirting Present
-
Skirting
-
All Service Door Latches Present
-
Service Door Latches
-
All Other Locks Present & Working
-
Locks
-
All Chip & Pins Present
-
Chip & Pin
-
Any Damage
-
Damage
-
Bump Rail Type (Stainless or Rubber)
-
Bump Rail
-
Any Current Issues With SSC
-
Rebranding Packs Required
-
Queuing Stickers Required
-
Bag Holders present or Required
-
General Condition
Access
-
SSC Access (Free Standing, Against Wall , Back to Back ect)
-
Photos
-
Adjacent to Basket Checkouts
-
Photos
-
Adjacent To Lottery Terminal. If So Will Lottery Terminal Be Affected
-
Photos
-
Any Building Works Required For Access
-
Photos
-
Any Works Required to Basket Checkouts or Infills
-
Photos
-
Ceiling type
-
Ceiling Hight
Fog Bandit
-
Fog Bandit Location and/or Feed
-
Photos
RAP Station
-
RAP Version
-
Photos
-
Location
-
Photos
-
Fixed Down
-
Photos
-
Condition
-
Photos
-
Any Damage
-
Photos
-
Door Latches Present
-
Photos
-
Cash Tube or Service Pole
Floor Trunking
-
Size & Colour
-
All Lids Present
-
Any Damage
-
Quantity Required
-
Floor Trunking
Tri-Lights
-
General Condition
-
Working Correctly
-
Any Service Poles
-
Any Service Poles Checkout Numbers
-
Any Cash Tube Poles Checkout Numbers
-
Need Cleaning
-
Quantity Required
-
Tri-Lights & Cash Tubes
Power Trunking
-
Colour
-
Photos
Recycled parts
-
BoBs Side Panels Required
-
Photos
-
BoBs End Panels Required
-
Photos
-
BoBs Bagging Shelfs Required
-
Photos
-
Electrical Box Covers Required
-
Photos
Variations & Extras
-
Extras
-
Variations
Store Responcibilities
Store Responcibilities
-
De-Merchandise Any Areas Required
-
To Allow Contractors Access To Welfare Facilities (eg Staff Canteen & Toilets)
-
To Cash Up All SSCs & Any Other Checkouts Being Worked On Before Start Time See Above
-
To Ensure All Cash Pods Are Accounted For Before Any Work is Commenced
-
To Contact Central Office if Access To Cash Office is Required