Information
-
Client / Site
-
Store Name & No.
-
Contract Number
-
Space Engineering Services - Project Manager
-
Tesco - SDM
-
Tesco - Main Contractor (Company)
-
Conducted on
Refrigeration Contract Finalisation Form
EQUIPMENT SUMMARY
-
PLANT MANUFACTURER(S)
- SPACE ENGINEERING PACK BUILD / ADVANSOR
- SPACE ENGINEERING PACK BUILD / KELVION (SEARLE)
- KELVION (SEARLE) CONDENSING UNITS
- COS CONDENSING UNITS
- HUBBARD CONDENSING UNITS
- ZANOTTI CONDENSING UNITS
- N / A
- FROSTPACK
- PR PRODUCTS
- EXISTING RETAINED
-
CONDENSER / GAS COOLER MANUFACTURER(S)
- SPACE ENGINEERING PACK BUILD / ADVANSOR
- SPACE ENGINEERING PACK BUILD / KELVION (SEARLE)
- COOLER & CONDENSERS
- FRIGA-BOHN
- RIVACOLD
- 3T
- N / A
- EXISTING RETAINED
-
CABINET MANUFACTURER(S)
- CARTER RETAIL
- KAPLANLAR
- NUTTALLS
- MANOR CONCEPTS
- SPACE FRESH FOODS
- VERCO
- N / A
- EXISTING RETAINED
-
EVAPORATOR MANUFACTURER(S)
- SEARLE
- RIVACOLD
- FOSTER COLDSTORES
- N / A
- EXISTING RETAINED
-
CONTROL / ALARM MANUFACTURER(S)
- DANFOSS
- CPC
- CDK
- N / A
- EXISTING RETAINED
-
LEAK DETECTION MANUFACTURER(S)
- DANFOSS
- CPC
- N / A
- EXISTING RETAINED
-
COLDROOM MANUFACTURER(S)
- CARTER COLDSTORES
- FOSTER COLDSTORES
- N / A
- EXISTING RETAINED
CABINETS & SALES FLOOR
-
CABINET INSTALLATION COMPLETE AS PER LATEST RETAIL LAYOUT & MAIN STORE SPECIFICATION? (INC PHOTOS)
-
NO WATER LEAKS PRESENT AND ABOVE FLOOR DRAINS TESTED TO CLIENT SPEC?
-
PUMP LOCATION MARKED AT BASE OF CABINET? (INC PHOTOS)
-
ALL CABINET NIGHTBLINDS & DOORS OPERATION TESTED AND LEFT FULLY OPERATIONAL?
COLDROOMS
-
FROZEN FOOD FREEZER INSTALLATION COMPLETE AS PER LATEST LAYOUT & MAIN STORE SPECIFICATION?
-
EVAPORATOR (CLEAR OF ICE)
-
CONTROL PANEL
-
DRAINAGE INSTALLATION / CONDENSATE PUMP (EARTH BONDED)
-
RACKING
-
STRIP CURTAINS
-
PRODUCE & FATS CHILLER INSTALLATION COMPLETE AS PER LATEST RETAIL LAYOUT & MAIN STORE SPECIFICATION?
-
EVAPORATOR (CLEAR OF ICE)
-
CONTROL PANEL
-
DRAINAGE INSTALLATION / CONDENSATE PUMP (EARTH BONDED)
-
RACKING
-
STRIP CURTAINS
-
MEAT CHILLER INSTALLATION COMPLETE AS PER LATEST RETAIL LAYOUT & MAIN STORE SPECIFICATION?
-
EVAPORATOR (CLEAR OF ICE)
-
CONTROL PANEL
-
DRAINAGE INSTALLATION / CONDENSATE PUMP (EARTH BONDED)
-
RACKING
-
STRIP CURTAINS
-
DOT COM FREEZER INSTALLATION COMPLETE AS PER LATEST LAYOUT & MAIN STORE SPECIFICATION?
-
EVAPORATOR (CLEAR OF ICE)
-
CONTROL PANEL
-
DRAINAGE INSTALLATION / CONDENSATE PUMP (EARTH BONDED)
-
RACKING
-
STRIP CURTAINS
-
DOT COM CHILLER INSTALLATION COMPLETE AS PER LATEST RETAIL LAYOUT & MAIN STORE SPECIFICATION?
-
EVAPORATOR (CLEAR OF ICE)
-
CONTROL PANEL
-
DRAINAGE INSTALLATION / CONDENSATE PUMP (EARTH BONDED)
-
RACKING
-
STRIP CURTAINS
-
BAKERY FREEZER INSTALLATION COMPLETE AS PER LATEST LAYOUT & MAIN STORE SPECIFICATION?
-
EVAPORATOR (CLEAR OF ICE)
-
CONTROL PANEL
-
DRAINAGE INSTALLATION / CONDENSATE PUMP (EARTH BONDED)
-
RACKING
-
STRIP CURTAINS
-
BAKERY CHILLER INSTALLATION COMPLETE AS PER LATEST RETAIL LAYOUT & MAIN STORE SPECIFICATION?
-
EVAPORATOR (CLEAR OF ICE)
-
CONTROL PANEL
-
DRAINAGE INSTALLATION / CONDENSATE PUMP (EARTH BONDED)
-
RACKING
-
STRIP CURTAINS
-
CUSTOMER CAFE FREEZER INSTALLATION COMPLETE AS PER LATEST LAYOUT & MAIN STORE SPECIFICATION?
-
EVAPORATOR (CLEAR OF ICE)
-
CONTROL PANEL
-
DRAINAGE INSTALLATION / CONDENSATE PUMP (EARTH BONDED)
-
RACKING
-
STRIP CURTAINS
-
CUSTOMER CAFE CHILLER INSTALLATION COMPLETE AS PER LATEST RETAIL LAYOUT & MAIN STORE SPECIFICATION?
-
EVAPORATOR (CLEAR OF ICE)
-
CONTROL PANEL
-
DRAINAGE INSTALLATION / CONDENSATE PUMP (EARTH BONDED)
-
RACKING
-
STRIP CURTAINS
-
STAFF CAFE FREEZER INSTALLATION COMPLETE AS PER LATEST LAYOUT & MAIN STORE SPECIFICATION?
-
EVAPORATOR (CLEAR OF ICE)
-
CONTROL PANEL
-
DRAINAGE INSTALLATION / CONDENSATE PUMP (EARTH BONDED)
-
RACKING
-
STRIP CURTAINS
-
STAFF CAFE CHILLER INSTALLATION COMPLETE AS PER LATEST RETAIL LAYOUT & MAIN STORE SPECIFICATION?
-
EVAPORATOR (CLEAR OF ICE)
-
CONTROL PANEL
-
DRAINAGE INSTALLATION / CONDENSATE PUMP (EARTH BONDED)
-
RACKING
-
STRIP CURTAINS
-
CLICK & COLLECT FREEZER INSTALLATION COMPLETE AS PER LATEST LAYOUT & MAIN STORE SPECIFICATION?
-
EVAPORATOR (CLEAR OF ICE)
-
CONTROL PANEL
-
DRAINAGE INSTALLATION / CONDENSATE PUMP (EARTH BONDED)
-
RACKING
-
STRIP CURTAINS
-
CLICK & COLLECT CHILLER INSTALLATION COMPLETE AS PER LATEST RETAIL LAYOUT & MAIN STORE SPECIFICATION?
-
EVAPORATOR (CLEAR OF ICE)
-
CONTROL PANEL
-
DRAINAGE INSTALLATION / CONDENSATE PUMP (EARTH BONDED)
-
RACKING
-
STRIP CURTAINS
-
PROVISIONS CHILLER INSTALLATION COMPLETE AS PER LATEST RETAIL LAYOUT & MAIN STORE SPECIFICATION?
-
EVAPORATOR (CLEAR OF ICE)
-
CONTROL PANEL
-
DRAINAGE INSTALLATION / CONDENSATE PUMP (EARTH BONDED)
-
RACKING
-
STRIP CURTAINS
-
DAIRY CHILLER INSTALLATION COMPLETE AS PER LATEST RETAIL LAYOUT & MAIN STORE SPECIFICATION?
-
EVAPORATOR (CLEAR OF ICE)
-
CONTROL PANEL
-
DRAINAGE INSTALLATION / CONDENSATE PUMP (EARTH BONDED)
-
RACKING
-
STRIP CURTAINS
-
FISH CHILLER INSTALLATION COMPLETE AS PER LATEST RETAIL LAYOUT & MAIN STORE SPECIFICATION?
-
EVAPORATOR (CLEAR OF ICE)
-
CONTROL PANEL
-
DRAINAGE INSTALLATION / CONDENSATE PUMP (EARTH BONDED)
-
RACKING
-
STRIP CURTAINS
REFRIGERATION PLANT
-
PLANT INSTALLATION AS PER LATEST LAYOUT & PLANNING DRAWINGS? (INC PHOTOS)
-
REFRIGERANT & OIL LEVELS VISIBLY CHECKED NO ALARMS PRESENT? (INC PHOTOS)
-
SAFE & SUITABLE WORKING ACCESS / LIGHTING PROVIDED? (IF NO THEN DETAIL WHO IS RESPONSIBLE)
-
PANEL / ACCESS KEYS SUPPLIED?
ALARM / LEAK DETECTION
-
CO2 OR HFC INSTALLATION?
-
LEAK DETECTION INSTALLATION / SENSOR LOCATION COMPLETE AS PER LATEST DESIGN & MAIN STORE SPECIFICATION? (INC PHOTOS)
-
ALL STROBES / ALARMS TESTED AND FULLY OPERATIONAL?
-
LEAK DETECTION INSTALLATION COMPLETE AS PER LATEST DESIGN & MAIN STORE SPECIFICATION? (INC PHOTOS)
COMMISSIONING / SYSTEM LABELLING / O&M MANUALS
-
ALL PLANT, CABINETS & COLDROOMS HAVE BEEN SET / COMMISSIONED TO LATEST EXP SPECIFICATION?
-
ALL CABINETS, PLANT, COLDSTORES, LEAK DETECTION AND CONTROLS HAVE BEEN CLEARLY LABELLED AS PER SPECIFICATION? (INC PHOTOS)
-
ALL ALARM MONITORING EQUIPMENT IS FULLY COMMUNICATING LOCALLY? (INC PHOTO)
-
ALL ALARM / MONITORING EQUIPMENT IS FULLY COMMUNICATING REMOTELY WITH IMS?
-
HAVE IMS CONFIRMED REFRIGERATION IS FULLY COMMUNICATING REMOTELY WITH THEM?
-
PED LABEL TIE WRAPPED TO PIPEWORK AS IT LEAVES PACK? (INC PHOTO)
-
GAS CYLINDERS COLLECTED?
-
SCHEDULED COLLECTION DATE?
HANDOVER SIGNOFF
-
SPACE ENGINEERING PROJECT MANAGER
-
INCUMBENT REFRIGERATION CONTRACTOR
-
TESCO SDM (STORE DEVELOPMENT MANAGER)
-
TESCO MAINTENANCE
-
TESCO STORE MANAGER