Information
-
Store Name & No.
-
Contract Number
-
Project Manager
-
Conducted on
-
Document No.
Refrigeration Contract Finalisation Form
CABINETS & SALES FLOOR
-
CABINET INSTALLATION COMPLETE AS PER SCOPE OF WORK
-
CABINET REFURBISHMENTS ARE COMPLETE AS PER SCOPE OF WORK
-
NO WATER LEAKS PRESENT AND ABOVE FLOOR DRAINS TESTED TO CLIENT SPEC
-
NO. PUMPS AND LOCATION MARKED ON CABINET
COLDROOM
-
THE COLDROOM INSTALLATION IS COMPLETE INC RACKING / PRV / PROBES / PUMPS / EXTERNAL
-
THE EVAPORATORS ARE CLEAR OF ICE AND FULLY OPERATIONAL
-
COLDROOM CURTAINS INSTALLED TO CURRENT SPEC
-
REFRIGERANT LEAK DETECTION INSTALLED AND COMMISSIONED
-
CONTROL PANEL OPERATIONAL, PROTECTED AND KEYS SUPPLIED
-
DRAINS ARE INSTALLED AND COMPLETED TO SPEC INC TOP HAT / PROTECTION / EARTH BONDING
AC & EXTRACTION
-
AC INSTALLATION IS COMPLETE AS PER SCOPE OF WORK INC UPGRADED UNIT / AV MOUNTS
-
AC AND CONTROLS ARE FULLY OPERATIONAL
-
EXTRACTION INSTALLATION COMPLETE INC GRILLS / DUCTWORK / LOUVRE / THERMOSTAT
PLANT
-
PLANT INSTALLATION IS TO THE CLIENT SPECIFICATION & GUIDELINES
-
REFRIGERANT LEVELS VISIBLY CHECKED AND NO LIQUID LEVEL ALARMS ARE PRESENT
-
OIL LEVELS VISIBLY CHECKED AND NO ALARMS ARE PRESENT
-
SAFE & SUITABLE WORKING ACCESS AND LIGHTING HAS BEEN INSTALLED BY PRINCIPLE CONTRACTOR
-
PLANT & PANEL KEYS SUPPLIED
ALARM / LEAK DETECTION
-
ALL ALARM & MONITORING EQUIPMENT IS INSTALLED AND COMPLETE
OPERATION & MAINTENANCE MANUALS
-
O&M MANUAL ON SITE (CD COPY TO MAIN CONTRACTOR) WITHIN 21 DAYS OF STORE OPENING - 21 DAYS OF OPENING <br>
-
PED LABLE TIE WRAPPED TO PIPEWORK AS IT LEAVES PACK
-
ALL CABINETS, PLANT, COLDSTORES AND PANELS HAVE BEEN CLEARLY LABELLED TO SPEC
COMMISSIONING
-
ALL EQUIPMENT SUPPLIED HAS BEEN CORRECTLY COMMISSIONED USING THE APPROPRIATE MANUFACTURES SUGGESTED DESIGN PARAMETERS
-
GAS BOTTLES COLLECTED
HANDOVER / HANDOVER ARRANGEMENTS
-
The Installing Contractor - I confirm that the equipment installed is to the customers specification and complete for use with the exception of the items recorded in this document.
The Maintenance Contractor - We have accepted that the equipment installed at completion is of an acceptable condition for ongoing maintenance & service. All items listed for action on this form are to be completed as above. -
Maintaining Contractor
-
Tesco Maintenance
-
Tesco Representative
-
Space PM
-
Store Manager Trained
Comments
-
Comments