Information
-
Subdivision Name
-
Stage
-
Reeds Project Number
-
Conducted on
-
Prepared By
-
Form: fun oh
-
Weather
-
Site Conditions
-
Type of Audit?
- Road & Drainage
- Sewer
- Water & Recycled Water
Tap to enter information
-
Are current plans onsite?
Road & Drainage
-
Tree Clearing
Tap to enter information
-
Comments
-
Stripping
Tap to enter information
-
Comments
-
Bulk Earthworks
Tap to enter information
-
Comments
-
Boxing
Tap to enter information
-
Comments
-
Drainage
Tap to enter information
-
Comments
-
Pits
Tap to enter information
-
Comments
-
Subgrade Improvement
Tap to enter information
-
Comments
-
Subsoil Drains
Tap to enter information
-
Comments
-
Sub Base FCR
Tap to enter information
-
Comments
-
Upper Sub Base FCR
Tap to enter information
-
Comments
-
Base FCR
Tap to enter information
-
Comments
-
Asphalt
Tap to enter information
-
Comments
-
Conduits (Road Crossings)
Tap to enter information
-
Comments
-
House Drains
Tap to enter information
-
Comments
-
Electrical Works
Tap to enter information
-
Comments
-
Telstra Works
Tap to enter information
-
Comments
-
Kerb & Channel
Tap to enter information
-
Comments
-
Footpath
Tap to enter information
-
Comments
-
Crossings
Tap to enter information
-
Comments
Tap to enter information
Sewer
-
Retail Water Authority
-
Retail Water Authority Project Number:
-
Contractor
1. Protection of People, Property & Environment
-
1.01. Trenching Operations (Benching & Shields) - Cl13.5
-
1.02. Site Plant & Equipment
-
1.03. Helmets if appropriate
-
1.04. steel capped Boots
-
1.05. Safety Vests
-
1.06. Parawebbing of Non Working Open Trenches
-
1.07. Egress From Site - Traffic Control?
2. Materials Inspection
-
2.01. Storage and Handling of Materials
-
2.02. Materials and Products Meet Authorised Purchase Specification
-
2.03. Delivery Inspection of Products and Materials
-
2.04. Are current plans /specifications onsite
3. Excavations
-
3.01. Visual Inspection of Survey Set Out
-
3.02. Shoring, Benching, Battering
-
3.03. Excavation Tolerances
-
3.04. De-watering, Bulkheads & Trench Drainage
-
3.05. Blasting Compliance
-
3.06. Foundation Improvement Required
-
3.07. Stockpiling of Excavated Material
4. Installation of Pipelines
-
4.01. Accredited Main Layer on site
-
4.02. Trench Floor Preparation & Bedding Placement
-
4.03. Pipe Jointing - Cleaning, Inspection, and Preparation
-
4.04. Pipe Laying to Required Line and level
-
4.05. Property Connection Sewers & Marker Tape to standard
-
4.06. Trenchfill: Approved Material Only & Layered
-
4.07. Compaction to Standard
5. Structures
-
5.01. Pre Cast Conforming - Dimensions, Cover, Frame, Collar/Taper
-
5.02. In Situ Conforming - Dimensions, Cover & Frame
-
5.03. Shaft Assembled with Steps and & Spacing Correct
-
5.04. Sealant, Make Up Rings 7 Lids to Standard
-
5.05. Concrete Type to Specification
6.0 Connection to Existing Manholes
-
6.01. All Relevant QA Documentation Previously Provided
-
6.02. Approved Personnel Conducting Works
-
6.03. OH&S Requirements are being met - copy of Live Entry Permit on site - Entry No. and Expiry Date & Time
-
6.04. Connection to Live Sewer - Existing Junction / Cut in Junction
7. Practical Completion Inspection
-
7.01. Site Cleared and Restored
Tap to enter information
Water
-
Retail Authority
-
Retail Water Authority Project Number
-
Contractor
1. Protection of People, Property and Environment
-
1.01. Trenching Operations (Benching & Shields)
-
1.02. Helmets
-
1.03. Steel Capped Boots
-
1.04 Safety Vests
-
1.05. Parawebbing of Non Working Open Trenches
-
1.06. Egress From Site - Traffic Control?
2. Product and Materials
-
2.01. Transportation, Handling and Storage of Products and Materials
-
2.02. Materials and Products Meet Authorised Purchase Specification and Plan Requirements
-
2.03. Delivery Inspection of Products and Materials
-
2.04. Current Plan on Site / Specification on Site
3. Excavations
-
3.01. Visual Inspection of Survey Set Out
-
3.02. Shoring, Benching
-
3.03. Excavation Tolerances / Excessive Excavation Treatment
-
3.03(ii). Trenchless Excavation
-
3.04. De-Watering Drainage
-
3.05. Blasting Compliance
-
3.06. Foundation Improvement
-
3.07. Stockpiling of Excavated Material
4. Installation of Pipelines
-
4.01. Accredited Main Layer on Site
-
4.02. Trench Floor Preparation & Bedding Placement
-
4.03. Pipe Jointing - Cleaning, Inspection, and Preparation
-
4.04. Pipe Laying to Required Line and Level
-
4.05. Thrust Restraints and Anchor Blocks
-
4.06. Valves, hydrants & Surface Fittings Installed
-
4.07. Marking Tapes
-
4.08. Water Tapping Bands Aligned Correctly
-
4.09. Trench fill Approved Material Only & Layered
-
4.09(ii). Trenchless Excavations fill
-
4.10. Compaction to Standard
5. Acceptance Testing
-
5.01. Chlorination/Swabbing – As Marked Up on Attached Plan
-
5.02. Pressure Testing – As marked Up on Attached Plan
-
5.03. Visual Inspection
6. Connection to Existing Watermain
-
6.01. All Relevant QA Documentation Previously Provided
-
6.02. Accredited Personnel Conducting Works
-
6.03. Under Pressure Connections
7. Practical Completion Inspection
-
7.01. Site Cleared and Restored
Project Site Report - Construction
-
Project:
-
Job No:
-
Contractor:
-
Sub-Contractor
-
Date:
-
Time:
-
Site Conditions:
- Fine
- Overcast
- Rain
- Windy
- Other (Specify)
-
Other: (Specify):
-
Road and Drainage Progress:
-
Water Reticulation Progress:
-
Sewer Reticulation Progress:
-
Main Drainage Progress:
Occupational Health and Safety
-
General:
- Safety Vest
- Helmets
- Eye Protection
- Hearing Protection
- Boots
- Other
-
Other: (Specify):
-
Live Entry Works
- Confined Space Entry Permits
- Pit Covers/Falls Prevention Grate
-
Trenching:
- Trenching Open
- Benching of Trench
- Shields/Timbers
- Fencing/Para-Web Around Trenching
-
Traffic Management
- Signs/Control
- Mud on Road
- Dusty
-
Other Comments:
Environmental
-
Pollution:
- Dust Control
- Sediment Control
- Noise Abatement Measures
- Waste Management
-
Significant Flora/Fauna/Cultural:
- Protection/Fencing
- Fuel/Chemical Storage
- Current Plans/Other Relevant Documents Onsite
-
Other: (Specify):
-
Comments:
Safety Checklist: To be provided by Contractor prior to release of Progress Payment.
-
Copy of Contractors Safety Checklists provided or acknowledge that works adheres to OHS Act 2004:
-
Comments:
-
Report By:
Site Hazard/Risk Identification & Action
-
Image of Hazard Legend
Possible Hazards/Risks & Work Instructions
-
Ultra Violet Rays
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Is the Hazard Controlled?
-
Comment:
-
Extreme Weather
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Traffic Movement/Control
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Construction Vehicles, Equipment, Machinery
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Working in or near excavations
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Remote Work
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Working near Railway
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Objects falling from above
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Needles/Syringes
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Working with lasers
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Heights and Falls
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Manual Handling
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Noise
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Snakes, Spiders, Insects
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
High/Long Grass
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Overhead Power Lines
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Lifting Pit Lids Falls Protection Grate (FPG)
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Confined Spaces
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Wet/Slippery Conditions
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Dogs/Dangerous Animals
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Fencing
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Watercourses/Open Drains
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Over Hanging Trees
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Contaminated Soil
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Hazard Atmosphere
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
Hazard Chemicals
- Fatality
- Permanent Disability
- Lost Time Injury
- Medical Treatment
- Minor Injury
-
I/We confirm that prior to commencement of work on site I/We have conducted a hazard/risk assessment and will follow all procedures and will tale all appropriate action to ensure SAFE WORK PRACTICES.
-
Engineer Name/s:
-
Date:
-
Signature/s:
-
DO NOT PLACE YOURSELF OR OTHERS IN A DANGEROUS SITUATION