Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Select date
ENVIRONMENT
-
Rain Water Controls & Siltation
-
Pollution
-
Material Management
QUALITY - Conformance
-
Jointing
-
If using Nylon, What is the expiry date on the glue container.
-
Trench and Alignment
-
Trench Backfilling
-
Correct Depth
-
Warning Tape
-
Trace Wire
-
Materials - Approved
-
Handling and Storage
-
Inside of Pipe Clean
-
Separation from other Services
-
APA Approved Construction Plan on Site.
-
Test Equipment on Site and Suitable.
-
Meter Assembly Installation Passed.
-
Have Meter Sets been capped off and Warning Tape installed.
SAFETY - Conformance
-
Shoring Required, if so is it suitable for the project.
-
Traffic and Pedestrian Controls
-
Material Management
-
Clothing
-
HIRAC Completed
-
PPE
-
Fire Extinguisher on site
-
Utility Plans on Site
-
Plant Operators - Licenced
-
Contractors Certification Current
OTHER PHOTOS
-
Add media
FINAL AUDIT ON THE SUBDIVISION INFORMATION
-
What is the gas pressure reading at the subdivision.
-
Have the line valves been installed
-
Have the surrounds been installed
-
Have Valve numbers been installed
-
Has the pressure test been completed and passed.
-
Has the "As Constructed Plan" been submitted to APA Group.
-
Has there been any changes to the construction plan? If so what were they.
CERTIFICATE OF ACCEPTANCE
-
On behalf of APA Group accept the transfer of ownership and operation of the gas reticulation system in stalled within this subdivision.
I declare that I am in receipt of sufficient evidence to confirm that the reticulation system has been constructed in accordance with the requirements of "WGA-34 General Terms, Conditions, Design & Construction for New Subdivisions and Site Development". -
Add signature
-