Light Control Panel
-
Is the LCP fitted?
-
Is the LCP AV cabling terminated and connected as per the Heron Scope of Works?
AV Cabinet
-
Are cables shortened and socked into groups as per the Heron Scope of Works?
-
Are RJ45s in AV cab terminated?
Lighting Key Pads
-
Are lighting key pad inserts fitted?
-
Are Phoenix connectors terminated?
iPod Dock
-
Is the iPod Dock back box fitted correctly?
-
Are RJ45s terminated for iPod dock cables?
Touch Panel
-
Is the touch panel back box fitted?
-
Is the RJ45 terminated for Touch Panel cable?
Speakers
-
Are the speakers connected and installed?
CAT6 mod tap test for terminated RJ45s
-
Has the CAT6 link from the AP2 in the LCP to the AV cab passed the mod tap test?
-
Has the CAT6 link from the Touch Panel to the AV cab passed the mod tap test?
-
Have the 2 x CAT6 links from the iPod Dock to the AV cab passed the mod tap test?
Photos
-
Please attach any photos deemed necessary.
Items that require attention by third parties
-
Items that require third parties to complete.
Sign Off
-
Signed on behalf of Wave UK Projects
-
Signed on behalf of SmartComm