Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

AV Cabinet

  • Are mounting blocks fitted?

  • Are cables terminated to patch panel?

  • Is the patch panel installed (by mounting to blocks)?

  • Is the RF Gateway installed?

  • Is the cresnet cable terminated and connected to RF Gateway?

  • Are the required aerial cables terminated and connected?

  • Is the ABAR installed and associated cables connected?

  • Is the Network Switch installed (by mounting to blocks) and connected?

  • Are all cables terminated for the Amp?

  • Is the Amp connected and installed?

Lighting Key Pads

  • Are all lighting key pads connected and installed?

iPod Dock

  • Is the iPod Dock connected and installed?

Touch Panel

  • Is the Touch Panel connected and installed?

TV

  • Is the RS232 connector terminated , back shell fitted and passed continuity test from AP2 (in the LCP) to TV?

  • Is TV installed and connected?

Photos

  • Please attach photos deemed necessary.

Items that require attention by third parties

  • Items required by third parties to complete.

Sign Off

  • Signed on behalf of Wave UK Projects

  • Signed on behalf of SmartComm

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.