Information
-
Ticket of Work?
-
Client / Site
-
Conducted on
-
Contractor?
- John Scates
- CKD
- Advance Services
- CEG
- B&A Cabling
- Ben4ward Comms
- QUON
- Attain
-
Telstra LIC or New LIC?
- Telstra LIC
- New LIC
-
Audit carried out by?
- Chris Gunn
- Matt Waring
- Will Glover
- John O'Donoghue
- Matt Gill
- Nathan Canavan
-
Is the work compliant?
-
Do not continue with audit!
-
Select non compliant items from checklist!
- Pit
- LIC
- PCD
- Splicing
- Workmanship
-
Is a revisit to rectify non compliant items required?
-
Take note of issues highlighted!
-
Continue through audit form for details of non compliant items!
Pits. Ref: NBN-TE-CTO-1756 v4 section 6
-
Does the bush meet the NBN guidelines when entering the pit?<br>300mm if the pit is less than 3m from boundary.<br>450mm if the pit is greater than 3m from the boundary.<br>Is it flush?<br>NBN-TE-CTO-1756 v4. Section 5.2
-
Is the SDS cable connected to the correct multiport port?
-
Has the SDS cable been labeled correctly?<br>MSS-xxx PORTxx
-
Are the cables stored neatly in the pit?
-
Is there approximately 3m of excess cable and has it been taped and stored neatly at the side of the pit?
-
Are there any loops in the intermediate pits?
-
Comments!
Lead-in Conduit. Ref: NBN-TE-CTO-1756 v4. Sections 5 and 6
-
Has the Telstra LIC been used?
-
Disregard this section and go to PCD section!
-
Is the LIC installed in the best place to mount the PCD?<br>NBN-TE-CTO-1756 v4. Section 6.8.4
-
Does the LIC meet the NBN depth guidelines?<br>300mm to the boundary.<br>300mm up to 3m to the pit from the boundary.<br>450mm over 3m to the pit from the boundary.<br>NBN-TE-CTO-1756 v4. Section 6.8.6 & 5.2
-
Does the LIC meet the 410mm NBN standard on the premises wall?<br><br>NBN-TE-CTO-1756 v4. Section 6.8.4
-
Does the LIC meet the separation guidelines for: <br>Power:- 100mm (low voltage). 300mm (high voltage)<br>Gas pipes:- 100mm (Pipe size 100mm). 300mm (pipe size over 110mm)<br>Water mains:- 150mm (local reticulation). 300mm (high pressure)<br>Sewer:- 150mm (connection pipe). 300mm (mains)<br>Telecommunications:- 100mm<br><br>Ref:- NBN-TE-CTO-1756 v4. Section 6.8.7 LIC Minimum Separations. Table 14
-
Are there 2 conduit saddles securing the LIC? <br>500mm separation of saddles on longer Conduit runs.<br><br>NBN-TE-CTO-1756 v4. Section 6.8.4
-
Is the reinstated trench firm.<br>NBN-TE-CTO-1756 v4. Section 6.8.8
-
Does the SDS cable have adequate protection?
-
Has the bend radius of the lead-in been exceeded?<br>Corning ROC - 63mm<br>TE-Connect HDC - 100mm<br><br>Ref: NBN-TE-CTO-1756 v4 Section 6.2
-
If conduit has been run to the PCD, has it been run in the best way?<br>Ref: NBN-TE-CTO-1756 v4. Section 6.8.2
-
Comments!
PCD. Ref: NBN-TE-CTO-1512 v4. Section 5 - 6
-
Is the PCD mounted between 410mm and 1800mm from ground level?<br><br>Ref: NBN-TE-CTO-1756 v4. Section 6.8.4<br> NBN-TE-CTO-1512 v4. Section 5.1
-
Has the Telstra termination box (if used) been penetrated?<br>NBN-TE-CTO-1756 v4. Section: 6.8.2 Routing SDS Cable to NBNCo PCD.
-
Has a smaller diameter flexible conduit or similar been installed between the LIC and the PCD to provide protection for the SDS?<br>REF:- NBN-TE-CTO-1756 v4. Section 9.1 Installing the PCD / Installation Overview.
-
Has the PCD been mounted using rawl plugs and screws?
-
Has the PCD been properly secured to the wall?<br>Not to the mortar!
-
Does the PCD meet the clearances of:<br>Working clearance: 2000mm x 900mm x 900mm<br>Fixed services, pipes, taps, water meters: 150mm<br>Power source: 150mm<br>Corner of wall, window or balcony: 100mm<br>Left hand side of PCD: 255mm<br>NBN-TE-CTO-1512 v4. Section 5.1.1.3<br><br>
-
If a gas source is present, does the PCD meet the clearance associated with the source type:<br>Enclosed gas:- 150mm<br>Exposed gas:- 1000mm either side or 500mm above the regulator.<br>Exchangeable Cylinders:- See cone: 1500 from the centre at base + 500mm from top + 500mm above. (1500mm from cylinder)<br>Refillable Cylinders:- See cone: 3500mm from centre of base + 1500mm from top + 500mm above. (3500mm from cylinder)NBN-TE-CTO-1512 v4. Section 5.1.1
-
Have the cables been secured by zip ties?<br>NBN-TE-CTO-1512 v4. Section 6.1<br>
-
Has the multiport detail label been attached to the lead-in?
-
Does the lead-in complete 3 complete loops around the fibre management?<br><br>NBN-TE-CTO-1512 v4. Section 6.2
-
Have the grommets been sliced from centre to rear?<br>NBN-TE-CTO-1512 v4. Section 6.1
-
Is there any insulated fibre inside the fibre cassette past the plastic tab?
-
Is there enough excess fibre to loop around the inside of the cassette?
-
Is there any unprotected fibre in the cassette?
-
Has the Rubber boot been used on the FIC?
-
Comments!
Workmanship. NBN-TE-CTO-1512 v4.
-
Has the work been carried out to a high standard?
-
Does the work look aesthetically good?<br>Ref: NBN-TE-CTO-1512 v4. Section 2.3
-
Has the work area been left safe and free from rubbish?
-
If the customer is on site are they happy with the job?
-
Is the install compliant?
-
Revisit and rectify the highlighted items!