Information

  • Ticket of Work?

  • Client / Site

  • Conducted on

  • Contractor?

  • Telstra LIC or New LIC?

  • Audit carried out by?

  • Is the work compliant?

  • Do not continue with audit!

  • Select non compliant items from checklist!

  • Is a revisit to rectify non compliant items required?

  • Take note of issues highlighted!

  • Continue through audit form for details of non compliant items!

Pits. Ref: NBN-TE-CTO-1756 v4 section 6

  • Does the bush meet the NBN guidelines when entering the pit?<br>300mm if the pit is less than 3m from boundary.<br>450mm if the pit is greater than 3m from the boundary.<br>Is it flush?<br>NBN-TE-CTO-1756 v4. Section 5.2

  • Is the SDS cable connected to the correct multiport port?

  • Has the SDS cable been labeled correctly?<br>MSS-xxx PORTxx

  • Are the cables stored neatly in the pit?

  • Is there approximately 3m of excess cable and has it been taped and stored neatly at the side of the pit?

  • Are there any loops in the intermediate pits?

  • Comments!

Lead-in Conduit. Ref: NBN-TE-CTO-1756 v4. Sections 5 and 6

  • Has the Telstra LIC been used?

  • Disregard this section and go to PCD section!

  • Is the LIC installed in the best place to mount the PCD?<br>NBN-TE-CTO-1756 v4. Section 6.8.4

  • Does the LIC meet the NBN depth guidelines?<br>300mm to the boundary.<br>300mm up to 3m to the pit from the boundary.<br>450mm over 3m to the pit from the boundary.<br>NBN-TE-CTO-1756 v4. Section 6.8.6 & 5.2

  • Does the LIC meet the 410mm NBN standard on the premises wall?<br><br>NBN-TE-CTO-1756 v4. Section 6.8.4

  • Does the LIC meet the separation guidelines for: <br>Power:- 100mm (low voltage). 300mm (high voltage)<br>Gas pipes:- 100mm (Pipe size 100mm). 300mm (pipe size over 110mm)<br>Water mains:- 150mm (local reticulation). 300mm (high pressure)<br>Sewer:- 150mm (connection pipe). 300mm (mains)<br>Telecommunications:- 100mm<br><br>Ref:- NBN-TE-CTO-1756 v4. Section 6.8.7 LIC Minimum Separations. Table 14

  • Are there 2 conduit saddles securing the LIC? <br>500mm separation of saddles on longer Conduit runs.<br><br>NBN-TE-CTO-1756 v4. Section 6.8.4

  • Is the reinstated trench firm.<br>NBN-TE-CTO-1756 v4. Section 6.8.8

  • Does the SDS cable have adequate protection?

  • Has the bend radius of the lead-in been exceeded?<br>Corning ROC - 63mm<br>TE-Connect HDC - 100mm<br><br>Ref: NBN-TE-CTO-1756 v4 Section 6.2

  • If conduit has been run to the PCD, has it been run in the best way?<br>Ref: NBN-TE-CTO-1756 v4. Section 6.8.2

  • Comments!

PCD. Ref: NBN-TE-CTO-1512 v4. Section 5 - 6

  • Is the PCD mounted between 410mm and 1800mm from ground level?<br><br>Ref: NBN-TE-CTO-1756 v4. Section 6.8.4<br> NBN-TE-CTO-1512 v4. Section 5.1

  • Has the Telstra termination box (if used) been penetrated?<br>NBN-TE-CTO-1756 v4. Section: 6.8.2 Routing SDS Cable to NBNCo PCD.

  • Has a smaller diameter flexible conduit or similar been installed between the LIC and the PCD to provide protection for the SDS?<br>REF:- NBN-TE-CTO-1756 v4. Section 9.1 Installing the PCD / Installation Overview.

  • Has the PCD been mounted using rawl plugs and screws?

  • Has the PCD been properly secured to the wall?<br>Not to the mortar!

  • Does the PCD meet the clearances of:<br>Working clearance: 2000mm x 900mm x 900mm<br>Fixed services, pipes, taps, water meters: 150mm<br>Power source: 150mm<br>Corner of wall, window or balcony: 100mm<br>Left hand side of PCD: 255mm<br>NBN-TE-CTO-1512 v4. Section 5.1.1.3<br><br>

  • If a gas source is present, does the PCD meet the clearance associated with the source type:<br>Enclosed gas:- 150mm<br>Exposed gas:- 1000mm either side or 500mm above the regulator.<br>Exchangeable Cylinders:- See cone: 1500 from the centre at base + 500mm from top + 500mm above. (1500mm from cylinder)<br>Refillable Cylinders:- See cone: 3500mm from centre of base + 1500mm from top + 500mm above. (3500mm from cylinder)NBN-TE-CTO-1512 v4. Section 5.1.1

  • Have the cables been secured by zip ties?<br>NBN-TE-CTO-1512 v4. Section 6.1<br>

  • Has the multiport detail label been attached to the lead-in?

  • Does the lead-in complete 3 complete loops around the fibre management?<br><br>NBN-TE-CTO-1512 v4. Section 6.2

  • Have the grommets been sliced from centre to rear?<br>NBN-TE-CTO-1512 v4. Section 6.1

  • Is there any insulated fibre inside the fibre cassette past the plastic tab?

  • Is there enough excess fibre to loop around the inside of the cassette?

  • Is there any unprotected fibre in the cassette?

  • Has the Rubber boot been used on the FIC?

  • Comments!

Workmanship. NBN-TE-CTO-1512 v4.

  • Has the work been carried out to a high standard?

  • Does the work look aesthetically good?<br>Ref: NBN-TE-CTO-1512 v4. Section 2.3

  • Has the work area been left safe and free from rubbish?

  • If the customer is on site are they happy with the job?

  • Is the install compliant?

  • Revisit and rectify the highlighted items!

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.