Information
-
Ticket of Work / Area
-
Address
-
Installer
-
Audit carried out by.
-
Conducted on
-
Compliant?
-
Reference Documents. NBN-TE-CTO-1512 v4 BMS001813 v9
-
PCD - Customer side of Thruconnect.
-
Is there less than 5 metres of excess premises cable stored in the fibre guides?
-
Is there any insulated premises cable stored in the fibre cassette past the plastic tabs?<br>Ref: NBN-TE-CTO-1512 v4 Section 6.2.2
-
If a FIC has been used on the premises cable, has it been installed correctly?
-
Does the grommet form a tight hold on the premises cable?
-
Has the premises cable been secured with zip ties to the correct anchor points?
-
Is the premises cable protected?
-
Is the cable route subject to crushing or sharp edges?
-
Is the cable secured every 500mm?
-
Is the cable unobtrusive? Ie not next to a downpipe.
-
Has silicon been used to seal the building entry point?
-
Is the area neat and tidy?
-
Comments.
-
Compliant?
NTD and PSU.
-
Have the internals been installed in a prohibited area?
-
Have the internals been mounted 300mm from the floor to 1700mm to the top of the highest device?
-
Has the NTD been installed above a power outlet or less less than 200mm from the other NBN equipment?
-
Has the internals been installed less than 1.5 metres from a water heater?
-
Is there the correct separation between the NTD enclosure and the PSU? 65 mm if the PSU is mounted on the right side of the NTD 50mm if the PSU is on the left side of the NTD enclosure. 70mm if the NTD is above the PSU.
-
Is there enough clearance around the PSU to open the battery door to 90 degrees?
-
If the PSU has not been installed is the labeled side of the power module facing the outside of the enclosure?
-
Has the excess premises cable been stored correctly and the fibre retaking clip been used?
-
If a FIC has been used, has a furcation tube been used"
-
Has the NTD identifier label been attached to the NTD below the LEDs?
-
Power outlet as supplied by the end user is within reach and appears visually safe? NB: NBN equipment may be plugged into a wall socket, extension cord or power board. Ref: NBN-TE-CTO-2021 v 1.0
-
Are the internals straight and level?
-
Has an NBN handbook been left on site?
-
Is the area clean and tidy, with no loose cable hanging out?
-
Comments.
-
Compliant?
As built and commissioning.
-
Were there any problems with the design?
-
Was the work carried out to a high standard?
-
Comments.
The Customer.
-
Was the customer or building representative present or on site?
-
Was the customer satisfied with the installation?
-
Was the install started on the agreed date and time?
-
Was the customer happy with the location of the equipment?
-
Did the installer discuss the job with the customer before commencing work?
-
Comments.
Results!
-
Does the install meet NBN compliance?
-
Is a revisit required?
-
Rectification details: