Information
-
Document No.
-
Job Site
-
Site Manager:
-
Conducted By:
-
Select date
-
Location
1. Safe Observations (Positive Feedback): Review and discuss
2. Task Analysis: Review any work that requires Task Analysis and proposed action
-
1. Test Pitting to 3-4m
-
2. Reinstatement in 300mm increments
-
3. Loading rig and travel
3. Hazard Boards Update: Describe new significant hazards and proposed action
-
1.
-
2.
-
3.
-
4.
-
5.
4. Follow up actions
-
1.
-
2.
-
3.
-
4.
-
5.
5. Accidents and/or Near Misses: Reported since last meeting and action taken
6. Subjects Introduced at Meeting: Information, training needed
7. Work Programme for Next Period:
ATTENDEES ( Signatures or Pictures of Sign in Sheet)
-
Take a Picture of signature sheet and add if Needed
-
1.
-
2.
-
3.
-
4.
-
5.