Information
-
Client
-
Project
-
Conducted on
-
Prepared by
Quality
1. Quality Policy and Procedure Manual
-
1.1 Current Toureen Quality Policy Statement signed and displayed?
-
1.2 Current Toureen Quality Procedures Manual accessible on site?
-
1.3 Toureen Group Site Managers Manual accessible on site?
-
1.4 Is a quality board in place?
-
1.5 Previous audits, reports, corrective actions?
-
1.6 Client issued non-conformance reports?
-
1.7 Has the site a designated person responsible for deliveries?
-
1.8 Is there a designated space for dropping delivery tickets off?
-
1.9 Has the site a named Quality Representative?
-
1.10 Has the site received any complaints?
2. Project Planning
-
2.1 Toureen employees copies of competency cards, certs, etc?
-
2.2 Is the most recent programme up to date?
-
2.3 Are all drawings and register up to date?
-
2.4 Are bending schedules in place and up to date?
-
2.5 Are all specs available and up to date?
3. Sub-contractors
-
3.1 All Sub-contractors must be approved by SHEQ team prior to works commencing?
-
3.2 Are appropriate certs available for all machinery and equipment?
-
3.3 Are Sub-contractor training cards copied and stored on site?
4. Documents and Records
-
4.1 Are site meeting minutes maintained and available?
-
4.2 Are all plant returns submitted and filed appropriately?
-
4.3 Are all materials received reports submitted and filed appropriately?
-
4.4 Are daily diaries being completed?
-
4.5 Have timesheets been submitted?
-
4.6 Have relevant materials been approved?
-
4.7 Are all records of requisitions been recorded and filed?
-
4.8 Is a Project Quality Plan in place?
-
4.9 Is an inspection and test plan in place?
-
4.10 Are materials being stored appropriately?
-
4.11 Material test results.
-
4.12 Drainage and duct inspection.
-
4.13 Earthworks operations inspection.
-
4.14 Flexible surfacing inspection.
-
4.15 Generic inspection.
-
4.16 Manhole.
-
4.17 Paving, slab, block and kerb inspection.
-
4.18 Pile cap inspection.
-
4.19 Lift pit and shaft inspection.
-
4.20 Below ground tank inspection.
-
4.21 Have all Requests for Information (RFI) been documented as well as their responses?
-
4.22 Are certificates of calibration in place for all relevant measuring equipment?
-
4.23 Is the calibration log maintained for all items requiring calibration?
-
4.24 Confirmation of Verbal Instruction (CVI).
-
4.25 Records of additional works.
-
4.26 Schedule of attendances for piling works.
-
4.27 Are concrete mix designs in place?
-
4.28 Are pre-pour Records completed?
-
4.29 Are all cubes written into cute sheets?
-
4.30 Does the site have records of all cube results following material testing?
-
4.31 Does the site have a concrete record sheet?
-
4.32 Is there a designated person to make cubes?
-
4.33 Are the persons trained?
-
4.34 Is the dude shed appropriate?
-
4.35 Other
5. Completion
-
5.1 Is O&M informationbeing maintained?
-
5.2 Are as builds being completed?
-
5.3 Stage completion forms.
6. Toureen Retail
-
6.1 Decommissioning Form (Shell only).
-
6.2 Key handover.
-
6.3 Meter reading form.
-
6.4 Asset Register (Shell only).
-
6.5 Shell / Atrelia quality control checklist.
-
6.6 Tank to pump grade verification.
-
6.7 Pump to POS checklist.
-
6.8 Water free certificate.
-
6.9 Pipework test cert.
-
6.10 Electrical certs.
-
6.11 Tank. Conformity cert.
-
6.12 Pump calibration and conformity.
-
6.13 LPG has cert.
-
6.14 Vapour recovery test certs - VR1 & VR2.
-
6.15 Shell project completion handover document / checklist.
Summary
-
Enter summary of site visit.
Sign Off
-
Auditor's signature