Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Team Members
-
Traffic Management Plan implemented and reflects the work?
-
All signage is of the correct size, type and installed at prescribed distances?
-
All road signage not in use or redundant is covered or removed and unobstructive?
-
Existing / temporary road conditions are adequate to support scope of traffic movements?
-
Traffic delineation controls i.e. flagging or line-marking installed and clearly visible?
-
Minimum width of road is maintained as per site requirements e.g. Construction Road 3.5m
-
Plant / Pedestrian separation barricading is as specified and is installed correctly?
-
Road Channel call-up signage is suitably sized and located in a clearly visible position?
-
Pedestrian crossings are not compromised and/or if temporarily installed are compliant?
-
Size and location of night work lighting is appropriate & delineation systems are reflective?
-
Signing Lighting and Guarding operators are competent and are working to traffic plan?
-
Temporary speed limit signage is of appropriate type and size and installed as per plan?
-
Electronic signals and signposting are correctly positioned are are without fault or defect?
Inspection Team
-
Name
-
Signature