General Requirements

  • Have all workers been inducted to site?

  • Are all workers wearing the correct PPE?

  • Is there a current Site Specific Work Plan / RAMS in place and signed by all personnel involved in the works?

  • Are all workers competent for the tasks being carried out?

  • Are the access / egress points clear of obstructions?

  • Is there a suitable documented rescue plan in place?

  • Are all ladders set up to the project requirements?

Scaffolding

  • Are scaffold plans/drawings on site up to date?

  • Is the scaffold to plan?

  • Does the scaffold erector have the appropriate CSCS qualifications?

  • Has the scaffold been placed on firm level ground (Fixed and Mobile)?

  • Does the scaffold have a current SAFFTAG at the access point dated and signed off?

  • Is the scaffold inspected every 7 days by authorised inspector and after weather events?

  • Weekly - GA3 Report of Results of Inspections of Work Equipment for Work at a Height?

  • Certificate - Handover of Scaffolding to User

  • Does the scaffold tie into the structure?

  • Is the safe working load (SWL) not exceeded?

  • Maximum Gap between Building/Structure and Platform does not exceed 225mm

  • Do lap boards have a minimum overlap of 500mm used on returns and gaps between working platforms?

  • Are all handrails and toe boards in place and capitulated?

  • Is there a safe and clear access to scaffold / ladder secured?

  • Is scaffolding of the appropriate type i.e. no mixed components?

  • Is the scaffold erected as per manufacturer's specifications (braces, decks, etc)?

  • Access ladders fitted internally (mobile)?

  • Are the brakes fitted effectively (mobile)?

  • Are there secured safety screens in place?

  • Exclusion zones are established below?

  • Is there delineation (hard barricading) with signage in place to protect against vehicles, plant and machinery?

  • Is there adequate signage provided? i.e. (No Entry - Workers above)?

  • Are electrical cables organised using insulated hooks?

Formwork / Falsework

  • Drawing are onsite and have been approved by an engineer?

  • Is there formwork built to design?

  • Are formwork systems of the approved type?

  • Are all starter bars capped?

  • Is fall protection in place for works over 1.5m and edge protection is in place?

  • Is propping for false work installed on firm ground?

  • Are props installed as per design?

  • Are props held securely in position?

  • Are there adequate supports in place?

  • Is there adequate supports in place?

  • Is there edge protection in place and installed correctly?

Observations / Additional Comments

  • undefined

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.