Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Traffic Control at Work Site Safety Inspection checklist
-
Inspector
-
Contractor
-
TMP/TCP Number
-
Type of Work
-
Duration of Work
-
TMP/TCP Number
-
Site Supervisor
-
TMP/TCP Modification
-
Location
-
Time / of Work
undefined
Conditions
-
Does the work require a T.M.P.
-
Does the work require T.C.P.
-
Is the approved plan on site?
-
Have signs & devices been set out as in the TMP/T.C.P.
-
If Modifications have been made are they been approved & marked on the TMP/T.C.P.
-
Are the requirements implimented for safe clearances to workers & pedestrian & traffic approach speeds ?
Traffic Controllers ( TCS )
-
Are the correct number of TC's being used ?
-
Have TC Certificates been sighted and the NO recorded ?<br>
-
Is TC's high visibility clothing in good repair ?
-
Do TC's have a clear escape route ?
-
Are Prepare To Stop and Traffic Controller Ahead signs correctly displayed ?
Sign & Devices
-
Are all signs & devices in good condition ?
-
Are all signs clearly visible & not affected by other signs, plant items, vegetation, shade, light glare etc ?
-
Are sign faces in compliance with AS1742.3 and have class 1 retro reflective material ?
-
Are the correct sign sizes being used ?
-
Are signs duplicated, where required ?
-
Are signs erected at the correct height & position ?
-
Are the signs erected to give the correct sign distance ?
-
Have the needs of pedestrians been provided for ?
-
Have the needs of cyclists been provided for ?
-
Are all property accesses to the site controlled ?
-
Are all cones & bollards installed at the correct spacing ?
-
Are the correct sized cones & bollards being used ?
-
Where tappers are used, have they been identified as Lateral Shift or Merge Tapers & are they the correct length ?
-
Where work is beyond a crest or curve, has the taper set up before the crest or curve ?
-
Auditor
-
Select date